1. Home
  2. Featured
  3. Amendment in the Guidelines for implementation of a scheme for setting up of over 2000 MW Grid-Connected Solar PV Power Projects
Amendment in the Guidelines for implementation of a scheme for setting up of over 2000 MW Grid-Connected Solar PV Power Projects

Amendment in the Guidelines for implementation of a scheme for setting up of over 2000 MW Grid-Connected Solar PV Power Projects

143
0

Amendment in the Guidelines for implementation of a scheme for setting up of over 2000 MW Grid-Connected Solar PV Power Projects with Viability Gap Funding (VGF) under Batch-III of Phas II of the JNNSM – reg.

For more information please see below link:

Source: mnre.gov.in
Anand Gupta Editor - EQ Int'l Media Network

LEAVE YOUR COMMENT

Your email address will not be published. Required fields are marked *