1. Home
  2. Tenders
  3. Clarification No.1 to Tender Document for Design, Engineering, Manufacture, Supply, Storage, Civil Work, Erection, Testing & Commissioning of 5.76 MWp (DC) Grid connected Rooftop solar PV Plant including O&M of the Plant for a period of 5 years
Clarification No.1 to Tender Document for Design, Engineering, Manufacture, Supply, Storage, Civil Work, Erection, Testing & Commissioning of 5.76 MWp (DC) Grid connected Rooftop solar PV Plant including O&M of the Plant for a period of 5 years

Clarification No.1 to Tender Document for Design, Engineering, Manufacture, Supply, Storage, Civil Work, Erection, Testing & Commissioning of 5.76 MWp (DC) Grid connected Rooftop solar PV Plant including O&M of the Plant for a period of 5 years

70
0

Clarification No.1 to Tender Document for Design, Engineering, Manufacture, Supply, Storage, Civil Work, Erection, Testing & Commissioning of 5.76 MWp (DC) Grid connected Rooftop solar PV Plant including O&M of the Plant for a period of 5 years….

For more information please see below link:

Anand Gupta Editor - EQ Int'l Media Network

LEAVE YOUR COMMENT

Your email address will not be published. Required fields are marked *