
Design manufacture supply erection testing and commissioning of Off-grid Solar Power Plants (With and Without Battery)including warranty and maintenance for 5 years
64
0UREDA invites Expression of Interest (EOI) for empanelment of the Channel Partner of MNRE under Off-grid and Decentralised Solar Application Programme for “Design, manufacture, supply, erection, testing and commissioning of Off-grid Solar Power Plants (With/ Without Battery Bank) including warranty & maintenance for 5 years at various locations in the State of Uttarakhand”
For More Information Pls.Go Through Below Attached Documents..
(64)
Related posts:
- Design, Manufacture, Supply, Erection, Testing and Commissioning along-with Operation and Maintenance for 5 years for total aggregate capacity of 139.52 KWp Grid-Connected Rooftop Solar PV Power Plant at Nigalpani Colony of Dhauliganga Power Station.
- Design Manufacture Supply Erection Testing Commissioning with Operation Maintenance for 10 years for aggregate capacity of 1000kWp Grid Connected Rooftop SPV Solar Power Plant with High Power Evacuation on HT Side Water Works Sector 26 Chandigarh
- EOI For Design, manufacture, supply, erection, testing and Commissioning including warranty, operation & maintenance for 5 years of 1 kWp to 500 kWp under the Grid Interactive Rooftop Solar Power Plants of MNRE and the Solar Power Policy in the State of Himachal Pradesh
- Design Manufacture Supply Erection Testing and Commissioning along with Operation and Maintenance for 10 years for total aggregate capacity of 440kWp Grid Interactive Rooftop SPV Solar Power Plants at 13 No. different sites in Chandigarh