Installation of 2*10 MW (AC) Grid Interactive Solar PV Power Project integrated with 8 MW hr. Battery Energy Storage Systemat AttamPahad and at Dolly Kunj, Port Blair, South Andaman.
270
0
Installation of 2*10 MW (AC) Grid Interactive Solar PV Power Project integrated with 8 MW hr. Battery Energy Storage Systemat AttamPahad and at Dolly Kunj, Port Blair, South Andaman.
For more information please see below link:
Related posts:
- Providing and Erecting Solar and LED street lighting fittings at village Shirshi Bk.(Ward No.2)Tq. Sonpeth and Dist. Parbhani (Budget Head 2515 Yojana 2017-18)
- IMPLEMENTATION OF 120 KWp GRID CONNECTED ROOFTOP SOLAR PV SYSTEM AT INDIAN NATIONAL SCIENCE ACADEMY(INSA) UNDER RESCO MODEL
- Electric Bus Charger
- UPNEDA Floats Three Tenders For Off-Grid Solar PV Power Plant