MNRE: Guidelines for Selection of 3000 MW Grid-connected Solar PV Power Projects under NSM, Phase-II, Batch-II, Tranche-I, “State Specifc Bundling Scheme” – Revocation / Cancellation of Amendment dtd. 30.09.2016 – reg.
45
0
The undersigned is directed to refer to the Guidelines for Selection of 3000 MW Grid=connected Solar PV Power Projects…..
For more information please see above link:
Related posts:
- Site Survey, designing, drawing, manufacturing, supply, installation, testing and commissioning of 100KWp Off Grid Solar PV Plant
- Engineering, Procurement, Construction (EPC) and 1 Year Free Comprehensive Operation Maintenance (O M) of 375 KWp On-Grid Ground Mounted Captive Solar Power Project at IndianOil LONI BOTTLING PLANT, BANTHALA VILLAGE, LONI, Dist.- GHAZIABAD, UP with
- Solar water heater
- PROVIDING HT EQUIPMENT FOR CHARGING INFRASTRUCTURE OF ELECTRIC BUSES AT CHANDIGARH