1. Home
  2. Tenders
  3. Operation and Maintenance of 5MW Solar Power Plant at BAP Ranipet Premises for Two years period
Operation and Maintenance of 5MW Solar Power Plant at BAP Ranipet Premises for Two years period

Operation and Maintenance of 5MW Solar Power Plant at BAP Ranipet Premises for Two years period

171
0

Minimum 2 (Two) staff with „ C „ License Holders for HT operations (11kV minimum) with Diploma / BE level qualifications. One out of these two shall be Technical – cum –Administrative in-charge having Diploma / Graduation in Electrical / Electronics Engg. With competence to deftly handle Technical and Operational Issues & will be responsible for complete plant operations.

More Information…..tender5

Anand Gupta Editor - EQ Int'l Media Network

LEAVE YOUR COMMENT

Your email address will not be published. Required fields are marked *