1. Home
  2. Featured
  3. SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 150MW (50MW x 3) GRID CONNECTED FLOATING SOLAR POWER PROJECTS TO BE INSTALLED AT RIHAND DAM, UP
SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 150MW (50MW x 3) GRID CONNECTED FLOATING SOLAR POWER PROJECTS TO BE INSTALLED AT RIHAND DAM, UP

SELECTION OF SOLAR POWER DEVELOPERS FOR SETTING UP OF 150MW (50MW x 3) GRID CONNECTED FLOATING SOLAR POWER PROJECTS TO BE INSTALLED AT RIHAND DAM, UP

158
0

This has reference to the NIT No. SECI/C&P/SPD/RfS/100MW FLOATING/UP/032018 published dated 16.03.2018 regarding the RfS Selection of Solar Power Developers for Setting up of 100MW (50MW x 2) Grid Connected Floating Solar Power Projects to be installed at Rihand Dam (also known as Govind Ballabh Pant Sagar Reservoir), Sonbhadra District, Uttar Pradesh.

The above mentioned total capacity of 100 MW (50 MW x 02) has been increased up to 150 MW (50 MW x 03).

The RfS document has been uploaded on www.tcil-india-electronictender.com (Only viewed on Microsoft Internet explorer 10.x or above browser). Prospective bidders are requested to refer to TCIL website for details.

Prospective bidders are requested to remain updated for any notices/ amendments/ clarifications etc. to the RfS documents through the websites www.seci.co.in and https://www.tcil-india-electronictender.com as no separate notification will be issued.

Tender Search Code (TSC) for the NIT : SECI-2018-TN000013

For more information please see below link:

Source: seci.co.in
Anand Gupta Editor - EQ Int'l Media Network

LEAVE YOUR COMMENT

Your email address will not be published. Required fields are marked *