1. Home
  2. Video
  3. The first installation at MIT Talegaon Campus out of a total capacity of 4 MW. This system is synchronised with DG set and will control the output of solar as per load and DG reserve capacity using a special controller. It is a great honour to be working as the Lead Consultant for this entire project…Amit Rane

The first installation at MIT Talegaon Campus out of a total capacity of 4 MW. This system is synchronised with DG set and will control the output of solar as per load and DG reserve capacity using a special controller. It is a great honour to be working as the Lead Consultant for this entire project…Amit Rane

101
0
Anand Gupta Editor - EQ Int'l Media Network

LEAVE YOUR COMMENT

Your email address will not be published. Required fields are marked *