Design, Engineering, Supply, Storage, Civil work, Erection of suitable structure, Testing and Commissioning of the 8 MWp Solar PV project including Operation and Maintenance of the project in RESCO Model for a period of 25 years
273
0
Design, Engineering, Supply, Storage, Civil work, Erection of suitable structure, Testing and Commissioning of the 8 MWp Solar PV project including Operation and Maintenance of the project in RESCO Model for a period of 25 years
For more information please see below link:
Related posts:
- Application Format for “Empanelment of Vendors/LSTK Contractors for Solar PV Plants at IndianOil Locations and Retail Outlets”.
- Supplying, installing and commissioning of solar PV module system, solar water heater with LED fitiings to boys hostel (Shyadri block) at COF Sirsi
- Providing and Erecting LED Street Light,Solar LED Highmast Fittings at POKHARNI
- UPNEDA Floats Tender for 106 MW of Solar Projects Under KUSUM Program