1. Home
  2. Tenders
  3. Extension04 – NIT for and behalf of THDCIL of 50 MW(AC) Solar PV Power Plant at Kasargod Solar Park
Extension04 – NIT for and behalf of THDCIL of 50 MW(AC) Solar PV Power Plant at Kasargod Solar Park

Extension04 – NIT for and behalf of THDCIL of 50 MW(AC) Solar PV Power Plant at Kasargod Solar Park

31
0

SECI has entered into an MOU with THDCIL to act as a Project Management Consultant for the delverlopment THDCIL’s 250 MW Solar PV Project. Subsequent to the signing of MOU; KSEBL, THDCIL and SECI has entererd into a Tripartite Agreement for the delvopment of the intial 50 MW Solar PV Project of the THDCIL in the 200 MW Solar Park being developmed in ths state of Kerala. During the joint site visit by the KSEBL, THDCIL and SECI; land at Manjeswar (Kasaragod) has been indentified. Recently we have received marking for the land from Renweable Power Corproation of Kerala Limited.

Solar Energy Corporation of India Limited (SECI) on behalf of THDC India Limited (THDCIL), SECI, invites online bids from eligible bidders on Single stage – Two envelop bid system in the prescribed forms and formats, for setting up of 50 MW (AC) Solar Photovoltaic Power Plant at Manjeswar (Kasaragod), Kasargod Solar Park in the state of Kerala (India), on turnkey basis and thereafter comprehensive Operation & Maintenance for 10 years of the Plant, as per the Scope of Work mentioned hereinafter. A qualified bidder needs to set up the total capacity of 50 MW (AC) power plant at the designated location. The last date of bid submission has been extended to 14:30 hrs, 18th November, 2016. Prospective bidders are requested to refer to TCIL website for details.

Anand Gupta Editor - EQ Int'l Media Network

LEAVE YOUR COMMENT

Your email address will not be published. Required fields are marked *