1. Home
  2. Policy & Regulation
  3. Petition for determination of transmission tariff of the assets covered under Transmission System for Ultra Mega Solar Power Park at Tumkur
Petition for determination of transmission tariff of the assets covered under Transmission System for Ultra Mega Solar Power Park at Tumkur

Petition for determination of transmission tariff of the assets covered under Transmission System for Ultra Mega Solar Power Park at Tumkur

0
0
Anand Gupta Editor - EQ Int'l Media Network

LEAVE YOUR COMMENT

Your email address will not be published. Required fields are marked *