1. Home
  2. Tenders
  3. Supply and Installation of 5 KVA Ongrid Solar Power Plant with 3 years warranty at 2 locations in Mangalpady Grama Panchayath, Kasaragod.
Supply and Installation of 5 KVA Ongrid Solar Power Plant with 3 years warranty at 2 locations in Mangalpady Grama Panchayath, Kasaragod.

Supply and Installation of 5 KVA Ongrid Solar Power Plant with 3 years warranty at 2 locations in Mangalpady Grama Panchayath, Kasaragod.

42
0
Anand Gupta Editor - EQ Int'l Media Network

LEAVE YOUR COMMENT

Your email address will not be published. Required fields are marked *