1. Home
  2. Tag "18% of installed wind capacity could be due for repowering"

18% of installed wind capacity could be due for repowering

High costs, focus on new capacity hinder upgrades MUMBAI: Even as the Centre has ramped up the renewable energy target for the country, nearly 18 per cent of the existing wind capacity is due for repowering. Repowering refers to the practice of installing more powerful wind turbines in existing sites to generate more power and […]

Role of prosumers in renewable energy adoption in India – EQ