1. Home
  2. Tag "Regulation 2016 seeking permission for installation of 2 MW solar power plant under developer mode on net metering basis"

ORDER: This petition is filed under Regulation No. 6 of 2016 of TSERC (Net Metering Rooftop solar PV Grid Interactive Systems), Regulation 2016 seeking permission for installation of 2 MW solar power plant under developer mode on net metering basis

ORDER: This petition is filed under Regulation No. 6 of 2016 of TSERC (Net Metering Rooftop solar PV Grid Interactive Systems), Regulation 2016 seeking permission for installation of 2 MW solar power plant under developer mode on net metering basis at the petitioner’s premises by relaxing the provisions of regulations which restrict the maximum capacity […]

Shree Cement joins RE100 Commits to transition 100% to Renewable Electricity by 2050 – EQ