1. Home
  2. Tag "Solapur Super Thermal Power Station"

In the matter of: Petition for determination of tariff of Solapur Super Thermal Power Station (1320 MW) for the period from the actual date of commercial operation of Unit-I

  In the matter of: Petition for determination of tariff of Solapur Super Thermal Power Station (1320 MW) for the period from the actual date of commercial operation of Unit-I (25.9.2017) to 31.3.2019 For more information please see below link:

Petition for adoption of tariff for 8800 MW Solar Power Plants connected to ISTS linked with setting up of 2200 MW Solar Manufacturing Plant – EQ Mag Pro