After repeatedly postponing the last date for receiving bids for the 10 gigawatt (GW) manufacturing-linked solar scheme, the Solar Energy Corporation of India (SECI) has eased the norms for potential firms. After repeatedly postponing the last date for receiving bids for the 10 gigawatt (GW) manufacturing-linked solar scheme, the Solar Energy Corporation of India (SECI) […]