DVC issue Tender for ETC of Floating System Arrangements including Balance Supply for the 10 MW(AC) Grid-Tied Floating Solar PV (FSPV) Plant at DVC RTPS, Raghunathpur – EQ
Summary:
### 📌 Tender Highlights (DVC)
* **Scope of Work**:
* Manufacture, supply, delivery, and installation of materials at site.
* Design, engineering, construction, erection, testing & commissioning of floating solar system arrangements including civil works at Mejia Thermal Power Station (MTPS).
* Supply of mandatory spares is also part of the contract.
* **Eligibility**:
* Contractors must meet MES/DVC eligibility norms, including prior experience in similar works, financial soundness, and statutory registrations.
* Foreign firms are not eligible; only Indian contractors/firms can participate.
* **Contract Value & Security**:
* Security Deposit-cum-Performance Guarantee is required, typically **5% of the total contract value**.
* Earnest Money Deposit (EMD) details are specified in the Notice Inviting Tender.
* **Completion Period**:
* The project completion timeline is **210 days (about 7 months)** from the date of issue of LOA/Work Order.
* **Penalty for Delay**:
* Delay attracts **1% per week**, subject to a maximum of **10% of the total contract value**.
* **Taxes & Duties**:
* Prices quoted must be inclusive of all taxes, levies, duties, and GST (wherever applicable).
* GST will be reimbursed based on actuals as visible in GSTR-2B.
—
For more information please see below link:
Related posts:
- DVC issue Tender for DEETC of Floating System Arrangements for 14 MW AC Grid Tied Floating Solar PV Plant on the Raw Water Reservoir at DVC MTPS, Mejia – EQ
- DVC issue Tender for DESITC of 234 MW(AC) Grid Tied Floating Solar PV (FSPV) Plant on DVCs Maithon Dam Reservoir at Maithon in the state of Jharkhand including 10 Years of Comprehensive O&M – EQ
- DVC issue Tender for Solar Pooling Station at Maithan for 234 MW FSPV Park along with the Construction of 132KV DC LILO from MHS-Sindri Line – EQ
- GSECL issue Tender for DEPC Contract for Development of 110 MW AC FSPV Plant at Kadana Dam Reservoir, Gujarat along with 10 Years Comprehensive O&M of Plant – EQ