1. Home
  2. Tenders
  3. CMPDI issue Tender for CAMC of Grid Connected Solar PV Power Plant at Rooftop of Office Building and Parking Area of CMPDI RI-V, Bilaspur – EQ
CMPDI issue Tender for CAMC of Grid Connected Solar PV Power Plant at Rooftop of Office Building and Parking Area of CMPDI RI-V, Bilaspur – EQ

CMPDI issue Tender for CAMC of Grid Connected Solar PV Power Plant at Rooftop of Office Building and Parking Area of CMPDI RI-V, Bilaspur – EQ

0
0

Summary:

## Key Business Information

| Parameter | Details |
|———–|———|
| **Tender Type** | Online, Single Cover System |
| **Portal** | https://coalindiatenders.nic.in |
| **Contract Duration** | 5 years (2024-2029) |
| **Estimated Cost (with GST)** | ₹35,40,000 |
| **Earnest Money Deposit (EMD)** | ₹44,250 (Online payment – NEFT/RTGS/Net-banking) |
| **MSE Exemption** | Yes (for EMD) – as per MSME policy for services |
| **Joint Venture** | Not allowed |
| **Bid Validity** | 120 days from bid submission end date |
| **Performance Security** | 5% of contract amount (excl. GST) |
| **Retention Money** | 5% deducted from each running bill |
| **Make in India Preference** | Applicable (Class-I local supplier preference with 20% margin) |
| **Land-border Country Restriction** | Applicable (requires Competent Authority registration) |

## Scope of Work (Business Critical)

The contractor is responsible for **end-to-end maintenance** of the solar PV plant, including but not limited to:

1. **Module cleaning** (every 5 days, using soft sponge/water – no detergents)
2. **Vegetation removal** for shadow-free operation
3. **Cable, wire, and connection box checks** (corrosion, tightness, insulation)
4. **String inverter maintenance** (dust removal, ventilation, functionality testing)
5. **Replacement of non-functioning parts** (except items still under manufacturer warranty – solar panels 24 years, inverters 4 years)
6. **Breakdown maintenance** – immediate response to restore generation
7. **Preventive maintenance** – at least once per quarter
8. **Data Acquisition System (DAS) upkeep** – cloud-based monitoring, Wi-Fi devices, reporting
9. **Protection systems** – lightning, surge, earthing, grid islanding
10. **Tools, tackles, safety equipment** – to be provided by contractor

> **Important**: The plant has been running **without any AMC since July 2024**. Bidders are strongly advised to **visit and inspect the plant** before bidding.

## Eligibility Criteria (Simplified for Business)

| Requirement | Document Needed |
|————-|—————-|
| PAN Card | Valid PAN |
| GST Status | Registration certificate (or CA certificate for unregistered) |
| Legal Status | Proprietorship affidavit / Partnership deed / CoI + MoA |
| DSC (Digital Signature) | Valid DSC from CCA-approved agency |
| Local Supplier Status (Make in India) | Self-certification of local content % |
| Border Country Restriction | Undertaking + Competent Authority registration (if applicable) |
| No debarment | Self-declaration |

> **Note**: Turnover exceeding GST threshold requires valid GST registration.

## Purchase Preference & MSE Benefits

### Make in India (Class-I Local Supplier)
– If L1 is **not** Class-I local supplier, the lowest Class-I bidder within **20% margin** of L1 price is invited to match L1 and awarded the contract.
– Self-certification of local content mandatory. For contracts > ₹10 Cr, auditor’s certificate with UDIN required.

### MSE Benefits (Services Tender)
– **25% of work value** reserved for MSEs.
– MSEs quoting within **price band of L1 + 15%** can match L1 and get award.
– Sub-targets: 3% for women-owned MSEs, 4% for SC/ST-owned MSEs.
– MSEs registered under **Udyam Registration** only.

## Key Compliance & Risk Areas

| Area | Implication |
|——|————-|
| **Site visit** | Not mandatory but strongly recommended – no claims later for site conditions |
| **Warranty items** | Contractor must handle warranty claims for panels (24 yrs) & inverters (4 yrs) at own cost – no extra payment |
| **Natural calamities** | Excluded from contractor’s scope |
| **Liquidated Damages (LD)** | 0.5% per week of delay, max 10% of contract value |
| **EMD forfeiture** | If L1 backs out or submits false documents |
| **Debarment** | Minimum 1 year for withdrawal after bid deadline, failure to sign agreement, or poor performance |
| **Sub-contracting** | Max 25% of contract value, prior approval required |

## Bidding Process Highlights

1. **Registration** on https://coalindiatenders.nic.in (free, one-time).
2. **DSC** mandatory for bidding.
3. **Bid submission** – single cover (technical + price together).
4. **Auto-extension** of bid deadline if less than 3 bids received (extended by 4 days).
5. **L1 determination** based on “Cost to Company” (GST included or excluded based on ITC availability).
6. **Post-bid clarification** – only for L1 bidder, 7 days to upload missing documents.

For more information please see below link:

Anand Gupta Editor - EQ Int'l Media Network