1. Home
  2. Anand Gupta

Anand Gupta

Editor - EQ Int'l Media Network

Govt mulling another production-linked incentive scheme for batteries: R K Singh – EQ

In Short : The Indian government is actively considering the implementation of another production-linked incentive (PLI) scheme, specifically targeting the battery manufacturing sector. Union Minister R K Singh has indicated that discussions are underway to introduce incentives aimed at boosting battery production in the country. This move aligns with the government’s larger strategy to enhance […]

Tata Power Renewable Energy Limited inks PDA with Endurance Technologies Limited for setting up 12.5 MW Captive Solar Plant – EQ

The plant is estimated to generate 27.5 MUs of power; will cut the CO2 emissions by over 9,125 tonnes/ kWh annually Tata Power Renewable Energy Limited (TPREL), a leading renewable energy player and a subsidiary of The Tata Power Company Limited, has signed a Power Delivery Agreement (PDA) with Endurance Technologies Limited, a leading auto […]

Navigating COP28: Expectations And Outcomes For A Sustainable Future – By Mr. Manish Dabkara – Chairman & MD, EKI Energy Services – EQ

As the world hurtles towards an uncertain climate future, the urgency of addressing the global climate crisis has never been more apparent. The 28th Conference of the Parties (COP28) is on the horizon, and the world is watching with bated breath as representatives from nearly 200 nations gather in Dubai from November 30 to December […]

Union Power and New & Renewable Energy Minister launches dashboard for Data on Adoption and Forecasts of Electric Vehicles – EQ

Future is Electric, diesel and petrol SUVs will become history: Power and New & Renewable Energy Minister R. K. Singh EV-Ready India dashboard forecasts 45.5% Compounded Annual Growth Rate in electric vehicles between 2022 and 2030; Annual sales of 1.6 crore EVs in India by 2030 The Union Minister for Power and New & Renewable […]

Petition for approval of introduction of the High Price Segment in Intra-Day, Day Ahead Contingency and Term Ahead Market – EQ

Petition for approval of introduction of the High Price Segment in Intra-Day, Day Ahead Contingency and Term Ahead Market For more information please see below link:

Petition of PPA for the development of 390 MW (2×195 MW) ISTS connected Wind-Solar Hybrid power project(s) – EQ

Petition of PPA for the development of 390 MW (2×195 MW) ISTS connected Wind-Solar Hybrid power project(s) For more information please see below link:

Petition of Transmission Service Agreement between WKTL & Tamil Nadu Generation and Distribution Corporation Limited – EQ

Petition of Transmission Service Agreement between WKTL & Tamil Nadu Generation and Distribution Corporation Limited For more information please see below link:

Petition for seeking amendment and transfer of Petitioner’s Inter-State Transmission Licence – EQ

Petition for seeking amendment and transfer of Petitioner’s Inter-State Transmission Licence For more information please see below link:

UREDA Issue Tender for Supply of 1 KWp to 500 KWp Grid connected Rooftop and small Solar Power Plant at various locations in the State of Uttarakhand – EQ

UREDA Issue Tender for Supply of 1 KWp to 500 KWp Grid connected Rooftop and small Solar Power Plant at various locations in the State of Uttarakhand For more information please see below link:

NTPC GREEN ENERGY Issue Tender for Supply of 300 MW ISTS CONNECTED GROUND MOUNTED SOLAR PV PROJECTS ANYWHERE IN INDIA – EQ

NTPC GREEN ENERGY Issue Tender for Supply of 300 MW ISTS CONNECTED GROUND MOUNTED SOLAR PV PROJECTS ANYWHERE IN INDIA For more information please see below link:     Tender Documents Date and Time of Start of Procurement of Tender Documents 23-Oct-2023 22:00:00 RTZ Corresponding Local Date and Time 23-Oct-2023 22:00:00 IST Date and Time of […]