1. Home
  2. Anand Gupta

Anand Gupta

Editor - EQ Int'l Media Network

Approved List of Models and Manufacturers (ALMM) Clarification – reg. (MNRE) – EQ

Approved List of Models and Manufacturers (ALMM) Clarification – reg. (MNRE) For more information please see below link:

Statcon Energiaa to Accelerate Clean Energy Expansion with Investment from Rotomag Enertec – EQ

In a move to accelerate its clean energy mission and global growth, Statcon Energiaa Private Limited (“Statcon Energiaa”) has secured an investment from Rotomag Enertec Limited, which now holds a majority stake in Statcon Energiaa. This investment marks a significant milestone in Statcon Energiaa’s journey, enabling them to scale their indigenously developed solutions. Statcon Energiaa […]

Petition of the Electricity Act for determination of tariff of 15 MW Solar PV Grid connected Power Projects located at Vithalpar, District Morbi – EQ

Summary: — ## **Gujarat State Electricity Corporation Limited (GSECL) vs. Gujarat Urja Vikas Nigam Limited (GUVNL)** **Forum:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar **Petition No.:** 2508 of 2025 **Order Date:** 08 August 2025 **Coram:** * Mehul M. Gandhi, Member * S.R. Pandey, Member — ### **1. Case Background** * **Petitioner:** Gujarat State Electricity Corporation Limited […]

Petition of the Electricity Act for determination of tariff of 40 MW Solar PV Grid connected Power Projects located at Haripar, District Jamnagar – EQ

Summary: — ## **Gujarat State Electricity Corporation Limited (GSECL) vs. Gujarat Urja Vikas Nigam Limited (GUVNL)** **Forum:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar **Petition No.:** 2511 of 2025 **Order Date:** 08 August 2025 **Coram:** * S.R. Pandey, Member * Mehul M. Gandhi, Member — ### **1. Case Background** * **Petitioner:** Gujarat State Electricity Corporation Limited […]

Petition of the Electricity Act for determination of tariff of 30 MW Solar PV Grid connected Power Projects at Chandarava, District Botad – EQ

Summary: — ## **GUVNL vs. Essar Power Gujarat Limited** **Forum:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar **Petition No.:** 2496 of 2025 **Order Date:** 05 August 2025 **Coram:** * S.R. Pandey, Member * Mehul M. Gandhi, Member — ### **1. Case Background** * **Petitioner:** Gujarat Urja Vikas Nigam Limited (GUVNL) * Represented by Adv. Mr. Utkarsh […]

DVC issue Tender for DESCEC of 228 MW AC grid-tied FSPV plant on the DVC Konar Dam Reservoir in Jharkhand and comprehensive O&M services of 10 years – EQ

Summary: — ## **Tender Summary – Damodar Valley Corporation (DVC)** **Document Type:** Notice Inviting Tender (NIT) **Issued by:** Damodar Valley Corporation **Tender Reference No.:** DVC/Tender/HEADQ/PROJECTS/SOLAR/PUR/00023 **Dated:** 07.08.2025 — ### **1. Key Dates** * **Tender Start Date:** 07.08.2025 (from 15:00 hrs) * **Bid Submission Deadline:** 28.08.2025 up to 15:00 hrs * **Technical Bid Opening:** 28.08.2025 at […]

RINL issue Tender for Restoration of 5 MW Ground Mounted Solar PV Power Plant in Visakhapatnam Steel Plant – EQ

Summary: — ## **Tender Summary – RINL / Visakhapatnam Steel Plant** **Document Type:** Notice Inviting Tender (NIT) with Corrigendum No. 1 **Issued by:** Contracts Department, Project Office, VSP **Tender No.:** VSP/1300/2025/00009 (Rfx No. 2800001214) **Dated:** 02.07.2025 **Corrigendum Date:** 05.08.2025 — ### **1. Key Dates** * **Submission Deadline:** 15:00 hrs on 18.08.2025 * **Bid Opening:** After […]

SECI issue Tender for RfS for Setting up 1200 MW ISTS-connected SPV Power Projects with 600MW/ 3600MWh ESS (SECI-ISTS-XXI) – EQ

Summary: — ## **SECI Tender for 500 MW Firm & Dispatchable Renewable Energy (FDRE) with Storage** **Issued by:** Solar Energy Corporation of India Ltd. (SECI) **Tender No.:** SECI/FDRE/500MW/2025 **Mode:** Tariff-based competitive bidding under e-reverse auction **Date:** 2025 — ### **Objective** SECI invites bids for **Selection of Developers** to supply **500 MW of Firm & Dispatchable […]

ITI Ltd issue Tender for DEPSITC of cumulative capacity of 15 MWp DC on grid Roof Top Solar Plants – EQ

ITI Ltd issue Tender for DEPSITC of cumulative capacity of 15 MWp DC on grid Roof Top Solar Plants For more information please see below link: Tender Details : Tender Title : Design, Engineering, Procurement, Supply, Installation, Testing and Commissioning of cumulative capacity of 15000 KWpDC on grid Roof Top Solar Plants Tender Reference Number […]

Punjab Achieves Threefold Growth in Renewable Energy Capacity Over the Past Decade – EQ

In Short : Punjab’s renewable energy capacity has surged from 660.44 MW in 2014–15 to 2,174.12 MW in 2024–25, tripling in a decade, Union Minister Shripad Naik informed the Rajya Sabha. Growth in solar and hydro projects has driven this expansion, positioning the state as a key contributor to India’s target of increasing the share […]