1. Home
  2. Anand Gupta

Anand Gupta

Editor - EQ Int'l Media Network

KEC International Secures ₹1,064-Crore Saudi Transmission Line Project, Strengthening Global T&D Presence – EQ

In Short : KEC International has secured a ₹1,064‑crore contract to design, supply, and install a 380 kV transmission line in Saudi Arabia. This win strengthens its presence in the Middle East and adds to its year-to-date order intake of over ₹15,000 crore. The project underscores KEC’s expertise in large-scale power transmission, enhancing its global EPC reputation […]

Power Integrations and Nvidia Collaborate to Revolutionize AI Data Center Power Efficiency – EQ

In Short : Power Integrations has partnered with Nvidia to advance 800 VDC power delivery systems for AI data centers, aiming to reduce energy losses and improve efficiency. Using its high-efficiency PowiGaN semiconductors, Power Integrations will support Nvidia’s open-standard server racks capable of handling 1 MW. The collaboration enhances sustainable, high-density power solutions and reinforces Power Integrations’ […]

Q2 Results: IREDA Posts 41% Rise in Net Profit, 81% Growth in Loan Disbursements – EQ

In Short : IREDA delivered robust Q2 FY26 performance, recording a 41% surge in net profit to ₹549 crore and an 81% increase in loan disbursements to ₹8,062 crore. Loan sanctions jumped 145% to ₹21,408 crore, while the loan book expanded 31% to ₹84,477 crore, underscoring IREDA’s strong role in powering India’s renewable energy expansion. […]

IREDA Half-Yearly Performance: 86% Growth in Sanc ons, Loan Book Expands 31% to ₹84,445 Crore – EQ

In Short : IREDA showcased stellar half-yearly results for FY26, with loan sanctions soaring 86% and the loan book expanding 31% to ₹84,445 crore. Disbursements and project financing grew significantly, reflecting strong demand for renewable energy investments. The company’s performance reinforces its pivotal role in accelerating India’s green energy transition and promoting sustainable development across […]

27-point action plan as per Stage-I of GRAP invoked in the entire NCR with immediate effect, to avoid further Deterioration of Air Quality in the region – EQ

In Short : The Commission for Air Quality Management (CAQM) has implemented a 27-point Stage-I action plan under GRAP across the NCR to prevent further air quality deterioration. Measures include dust control at construction sites, ban on biomass burning, stricter vehicle emission checks, increased road cleaning, and anti-smog operations. Agencies across Delhi, Haryana, UP, and […]

ADB Supports Indonesia’s Efforts to Strengthen Competitiveness, Green Growth, and Trade Acceleration – EQ

In Short : The Asian Development Bank (ADB) has approved a US $500 million policy-based loan to Indonesia under the *Competitiveness, Industrial Modernization, and Trade Acceleration (CITA) Program – Subprogram 3*. The funding aims to enhance Indonesia’s global competitiveness, promote green and inclusive industrial growth, reduce trade barriers, and support local and women-owned enterprises in […]

Full-Stack Validation: Sineng Electric Passes Whole-Station-Level Grid-Forming Test in China – EQ

Recently, Sineng Electric, in close collaboration with the project owner and Hunan Electric Test Research Institute Co., Ltd. (hereinafter referred to as “Hunan Xiangdian”), successfully completed a full-process grid-forming, grid-following, and off-grid test at the Changsha Ningxiang Guanshan 100MW/200MWh Energy Storage Power Station. The successful completion of the tests signifies that Sineng Electric’s grid-forming energy […]

Petition with CERC (Procedure, Terms and Conditions for Grant of Transmission License and other related matters) Regulations to POWERGRID Barmer I Transmission Limited – EQ

Summary: — ## ⚖️ **Case Summary – CERC Petition No. 789/TL/2025** * **Authority:** Central Electricity Regulatory Commission (CERC), New Delhi * **Date of Hearing:** 26 September 2025 * **Coram:** * Shri Jishnu Barua – Chairperson * Shri Ramesh Babu V. – Member * Shri Harish Dudani – Member * Shri Ravinder Singh Dhillon – Member […]

Petition for Adoption of Tariff for ISTS Grid connected Solar Power Projects of 1200 MW with 600 MW/2400 MWh ESS and with additional capacity – EQ

Summary: — ## ⚖️ **Case Summary – CERC Petition No. 773/AT/2025** * **Authority:** Central Electricity Regulatory Commission (CERC), New Delhi * **Date of Hearing:** 26 September 2025 * **Coram:** * Shri Jishnu Barua – Chairperson * Shri Ramesh Babu V. – Member * Shri Harish Dudani – Member * Shri Ravinder Singh Dhillon – Member […]

Petition for Adoption of 1200 MW Wind-Solar Hybrid Power Projects with Greenshoe Option of additional capacity to the ISTS for amended from time to time – EQ

Summary: — ## ⚖️ **Case Summary – CERC Petition No. 774/AT/2025** * **Authority:** Central Electricity Regulatory Commission (CERC), New Delhi * **Date of Hearing:** 23 September 2025 * **Coram:** * Shri Jishnu Barua – Chairperson * Shri Ramesh Babu V. – Member * Shri Harish Dudani – Member * Shri Ravinder Singh Dhillon – Member […]