BSNL issue Tender for Supply of Renewable Power through Green Energy Open Access at BSNL owned buildings – EQ
Summary:
—
### 📌 Tender Summary – BSNL Green Power Open Access
**Department:** Bharat Sanchar Nigam Limited (BSNL), Electrical MH Zone, Mumbai
**Work Title:** *Supply of Renewable Power through Green Energy Open Access at BSNL-owned buildings*
**Buildings Covered:**
1. **Regional Telecom Training Center (RTTC), Chinchwad, Pune**
* Assured Supply: 70,000 units/month
* Estimated Value: ₹3.18 Cr
* EMD: ₹6.37 lakh
2. **MHS Telephone Exchange, Pune**
* Assured Supply: 2,00,000 units/month
* Estimated Value: ₹5.62 Cr
* EMD: ₹11.25 lakh
**Key Conditions:**
* Bidders can participate for one or both buildings.
* Evaluation is on **discount % over DISCOM tariff** for each building separately.
* Quantity variation: ±25% allowed.
**Eligibility:**
* Indian registered company/LLP/firm.
* Must be **Independent Power Producer (IPP) / DISCOM / Power Trading Licensee**.
* No foreign companies allowed.
* Must have prior experience in **green power supply via Open Access** (solar/wind/hydro).
* Financial requirements:
* Net worth ≥ 30% of quoted capacity value.
* Minimum Average Annual Turnover (MAAT):
* RTTC Pune: ₹95 lakh
* MHS Pune: ₹169 lakh
* Working Capital/Line of Credit ≥ 30% of quoted capacity value.
**Contract Period:**
* **3 years**, extendable by another 3 years.
**Important Dates:**
* **Bid Submission Deadline:** 03.10.2025, 11:30 Hrs
* **Bid Opening (Online):** 06.10.2025, 12:00 Hrs
**Tender Fee & EMD:**
* Tender Fee: ₹4,000 + 18% GST (non-refundable).
* MSE bidders (with valid Udyam registration) exempted from Tender Fee & EMD.
**Bid Structure:**
* **Single Stage, Two Envelopes** (Techno-Commercial & Financial).
* Financial bid based on **single % discount on DISCOM tariff**.
**Payment Terms:**
* No advance payment.
* BSNL to clear invoices within 10–15 days (latest 6 months to comply with GST ITC).
* Payments via ECS.
**Other Key Points:**
* Supply of green energy must begin **within 3 months of LOI**.
* Performance Ratio (PR) must be ≥ 90%.
* Shortfall penalties: 2% to 10% of shortfall value (with escalation for repeat defaults).
* PPA to be signed within 30 days of LOI.
* Integrity Pact & NDA mandatory.
—
For more information please see below link: