Summary: — ### Key Amendments #### 1. Amendment to Regulation 1(4) – Banking Charge Validity Period The existing Regulation 1(4) is substituted to specify the validity period of banking charges: > **”The Banking Charge specified in Regulation 17.6 shall be effective from the date of notification of these Regulations up to 30th June 2026 or […]
Summary: — ### Key Amendments #### 1. New Provision: Dual Source Supply for HT/EHT Consumers (Regulation 6.14) A new sub-regulation **6.14** is inserted, which allows **HT/EHT consumers** to avail electricity supply from **two sources**, either: – **Simultaneous use** of both sources, or – One as a **standby source** **Conditions**: – Subject to **technical feasibility** and […]
Summary: — #### 1. Project & Regulatory Overview – **Core Objective:** SJVN sought the adoption of tariffs discovered through a competitive bidding process for a large-scale wind-solar hybrid power project. This is a **post-bid, regulatory approval** step required under the Electricity Act, 2003. – **Project Scope:** 1200 MW of Inter-State Transmission System (ISTS)-connected Wind-Solar Hybrid […]
Summary: — #### 1. Case Overview & Background – **Nature of Case:** This is a **Review Petition** filed by a power generator (Dhariwal Infrastructure Limited) against a previous CERC order. The petition was **dismissed** by the Commission for not meeting the legal grounds for a review. – **Underlying Dispute:** The case originates from a previous […]
Summary: — #### 1. Project & Regulatory Overview – **Core Objective:** SJVN sought the adoption of tariffs discovered through a competitive bidding process for a large-scale renewable energy project. This is a **post-bid, regulatory approval** step required under the Electricity Act, 2003. – **Project Scope:** 1200 MW of Interstate Transmission System (ISTS)-connected Solar PV Power […]
Summary: — The directive was issued during a hearing on **March 19, 2026**, in **Petition No. 515/TT/2025**, which seeks approval for transmission tariff true-up for the **2019–24 period** and determination for the **2024–29 period**. — ### Case Details | Parameter | Details | |———–|———| | **Petition No.** | 515/TT/2025 | | **Petitioner** | Power Grid […]
Summary: — ### Case Details | Parameter | Details | |———–|———| | **Petition No.** | 355/TT/2025 | | **Petitioner** | Power Grid Corporation of India Limited (PGCIL) | | **Respondents** | Bihar State Power (Holding) Company Limited (BSPHCL) and 5 others | | **Subject** | True-up of transmission tariff for 2019–24 period and determination for […]
Summary: —- #### 1. Subject Matter This petition is an application filed by **Energy Advisory Services Private Limited (EASPL)** under: – **Sections 14 and 15(1) of the Electricity Act, 2003** – **Regulation 6 of the CERC (Procedure, Terms and Conditions for Grant of Trading Licence and Other Related Matters) Regulations, 2020** (hereinafter “Trading Licence Regulations”) […]