Petition of the RERC (Transaction of Business) Regulations, 2021 – EQ

Summary: — # **1. Parties to the Case** ### **Petitioners** * **Thar Power Transmission Service Ltd.** (2326/2025) * **Barmer Power Transmission Service Ltd.** (2327/2025) * **Hadoti Power Transmission Service Ltd.** (2328/2025) ### **Respondents** * **Rajasthan Rajya Vidyut Prasaran Nigam Limited (RVPNL)** * **Rajasthan Urja Vikas & IT Services Limited (RUVITL)** * **Other parties (not specified […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Petition for procurement of 500 MW RTC power for 5 years for medium term Procurement of Electricity from Power Stations of Rajasthan Discoms – EQ

Summary: — # **1. Purpose of Petition** RUVITL filed the petition seeking **Commission approval** under Section 86(1)(b) of the Electricity Act for: ### **Procurement of 500 MW Round-the-Clock (RTC) power for 5 years** Based on: * Model Bidding Documents: **RFQ, RFP, APP** * As per **MoP (Government of India) Guidelines dated 29 Jan 2019** (and […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Drat GERC (Net Metering Roo5op Solar PV Grid Interactive Systems) (Fifth Amendment) Regulations, 2025 – EQ

Summary: — ### 1. Short title, extent, commencement * The amendment is titled **“Gujarat Electricity Regulatory Commission (Net Metering Rooftop Solar PV Grid Interactive Systems) (Fifth Amendment) Regulations, 2025.”** * It **extends to the whole of Gujarat** and **comes into force on publication in the Official Gazette**. ### 2. Amendment to **Clause 7** (connectivity / […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

In the matter of the RERC (Grid Interactive Distributed Renewable Energy Generating Systems) (Third Amendment) Regulations, 2025 – EQ

Summary: — ## **1. Introduction of Updated Definition: Distributed Renewable Energy System (DRE)** The Order introduces a comprehensive new definition of **DRE Systems**, applicable to domestic and non-domestic consumers. These systems use renewable sources (solar, hydro, biogas, biomass, geothermal, wind) and must be located on the consumer’s premises or group/shared locations. They may operate individually […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

In the matter of Aggregate Revenue Requirement, Tariff and Investment Plan for FY 2025-26 of JVVNL, AVVNL and JdVVNL – EQ

Summary: — ## **1. Financial Health of Discoms & Rationale for Tariff Structure** The Commission notes that **50% of Discoms’ costs are fixed**, but **only 17% of revenue** is recovered through fixed charges, creating a mismatch that weakens Discom finances and leads to borrowing burdens on consumers in the long term. To address this, the […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Petition of GERC (Conduct of Business) Regulations for Tariff 0Framework for Procurement of Power by Distribution Licensees and others from Wind Power Projects for State of Gujarat – EQ

Summary: — ### ⚖️ **Case Overview** * **Forum:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar * **Petition Type:** Review Petition under Regulation 72(1) of GERC (Conduct of Business) Regulations, 2004 * **Petition No.:** R.P. No. 29 of 2024 * **IA No.:** 51 of 2025 (for impleadment) * **Petitioner:** *M/s Safar Polyfibres Pvt. Limited* * **Respondent / […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Petition of the GERC (Conduct of Business) Regulations for extension of time period for commissioning of the Project of unforeseen and uncontrollable events – EQ

Summary: — ### ⚖️ **Case Overview** * **Forum:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar * **Petition No.:** 2514 of 2025 * **Interlocutory Application (IA):** No. 59 of 2025 * **Date of Order:** 04 October 2025 * **Coram:** Mehul M. Gandhi (Member) & S. R. Pandey (Member) * **Petitioner:** *German TMX Pvt. Ltd.*, Ahmedabad, Gujarat * […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Petition for Procurement of Power by Distribution Licensees and Others from Wind-Solar Hybrid Projects Including Storage and evacuation of power from its 6 MW Hybrid Power Plant being Force Majeure events – EQ

Summary: — ### ⚖️ **Case Overview** * **Forum:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar * **Petitioner:** *Opera Engitech Pvt. Ltd.*, Jamnagar, Gujarat * **Respondent:** *Gujarat Energy Transmission Corporation Ltd. (GETCO)*, Vadodara * **Coram:** Mehul M. Gandhi (Member) & S.R. Pandey (Member) * **Date of Order:** 29 September 2025 — ### 🧾 **Nature of Petition** The […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Petition of the PPA for supply of 70 MW wind power from its project in the state of Gujarat on account of certain Force Majeure events – EQ

Summary: — ### 🔹 **Nature of the Petition** A petition filed under **Sections 86(1)(b), (e), (f), and (k)** of the *Electricity Act, 2003*, read with **Article 8 of the Power Purchase Agreement (PPA)** dated **08.02.2024** between: * **Petitioner:** *M/s Juniper Green Kite Private Limited* * **Respondent:** *Gujarat Urja Vikas Nigam Limited (GUVNL)* The petition concerns […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Petition of GERC (Net Metering Rooftop Solar PV Grid Interactive Systems) Regulations installing rooftop solar PV Plants under PM Surya Ghar Muft Bijli Yojana – EQ

Summary: — ### 🔹 **Case Title** **Petition under Section 181 read with Section 86 of the Electricity Act, 2003** and **Regulations 18–20 of the GERC (Net Metering Rooftop Solar PV Grid Interactive Systems) Regulations, 2016**, seeking **exemption from the requirement of entering into net metering agreements** for residential consumers installing **rooftop solar PV systems under […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ