Summary: — ### Key Business Points #### 1. Project Scope and Commercials – **Work:** Installation of rooftop solar plants (totaling 80 KW) at various locations. – **Completion Period:** **180 days** from the date of site handover (approx. two weeks after acceptance of tender). – **Estimated Cost:** Rs. 71.98 Lakhs. This is a rough estimate and […]
Summary: — ### Key Business Points #### 1. Project Objective and Scope – **Goal:** To achieve CPCL’s net-zero targets and reduce energy costs by securing 100 MW of Round-the-Clock (RTC) renewable power. This will be done in two phases (Phase-1: 50 MW RTC, Phase-2: additional 50 MW RTC). – **Core Service:** Engaging a consultant to […]
Summary: — ### Key Business Points #### 1. Project Scope and Bidder Responsibilities – **Objective:** To develop a 350 KW grid-connected rooftop solar PV project at HCL Ghatsila. – **Scope of Work (SOW):** The project is a comprehensive turnkey contract, requiring the bidder to handle all aspects, including: – Preliminary site assessment (roof condition, power/water […]
Summary: — ### Key Business Points #### 1. Scope and Tendering Process – **Objective:** To procure Renewable Energy Certificates (RECs) to meet HURL’s compliance requirements for the year 2024-25. – **Procurement Method:** This is a **single tender**, exclusively inviting M/s NTPC Vidyut Vyapar Nigam Limited (NVVN) to bid. – **Bidding System:** The tender uses a […]
HPCL Owners Engineer issue Tender for installation of 140 MWp solar power plant with 400 MWH BESS in Andhra Pradesh For more information please see below link: Tender Details : Tender Title : Owners Engineer for installation of 210 MWp solar power plant with 400 MWH BESS in Maharashtra and for installation of 140 MWp […]
Summary: — ### **1. Project Overview (The Business Opportunity)** * **Project Name:** Development of 850 KW Grid Connected Rooftop Solar Power Project at AIIMS Raipur & Bhopal. * **Client:** NTPC Vidyut Vyapar Nigam Limited (NVVN). * **Scope:** A comprehensive **EPC + O&M contract**. The selected contractor is responsible for the entire project lifecycle: * **EPC:** […]
Summary: — ### **1. Project Overview (The Business Opportunity)** * **Project Name:** Provision of Rooftop Solar Plants totaling 500 KW at certain buildings in Patiala. * **Scope:** The project is divided into two main phases: * **Phase-1 (Main Project):** 6 Months for the construction and commissioning of the 500 KW solar plants. * **Phase-2 & […]
Summary: —- ### **Tender Overview (Appendix ‘A’)** – **Work**: PROVISION OF ROOF TOP SOLAR PLANT AT HQ DB AREA UNDER GE CHENNAI – **Estimated Cost**: Rs 42.71 Lakhs (This is a rough estimate and not a guarantee of the final cost) – **Completion Period**: 180 Days – **Contract Type**: Based on IAFW-2249 (1989 Print) and […]
NTPC Ltd issue Tender for EPC Package for Development of 1000 Mwh BESS Capacity at NTPC Rel Bikaner Solar Plant For more information please see below link: Tender Details : Tender Title : EPC PACKAGE FOR DEVELOPMENT OF 1000 MWh BESS CAPACITY AT NTPC REL BIKANER SOLAR PLANT Tender Reference Number : NREL-CS-5800-004(BESS1)-9 Tender Type […]