# **1. Purpose of Tender (Page 1)**

ICAR-CIARI invites **e-tenders under a two-bid system (Technical + Financial)** from:

* **Manufacturers**
* **Authorized dealers**
* **Authorized stockists**

for the **supply, installation, testing, and commissioning of a Hybrid Solar Power Plant**.

The tender is published on:
🔹 **[https://eprocure.gov.in/eprocure/app](https://eprocure.gov.in/eprocure/app)**
🔹 Also uploaded on the ICAR-CIARI website.

# **2. Key Dates – Critical Date Sheet (Page 1)**

| Activity | Date & Time |
| —————————————— | ————————————————————————– |
| **Tender Release** | 28.10.2025 at 05:30 PM |
| **Bid Submission Start** | 28.10.2025 at 05:30 PM |
| **Last date for EMD receipt (Port Blair)** | 19.11.2025 at 04:30 PM |
| **Last Date & Time for Online Submission** | 19.11.2025 at 05:00 PM |
| **Opening of Bids** | 21.11.2025 at 11:00 AM |
| **Address for Communication** | Director, ICAR-CIARI, Bathubasti, Garacharma PO, Sri Vijaya Puram – 744105 |

All activities are fully online except physical submission of **EMD**.

# **3. Scope of Supply – Schedule of Requirement (Page 2)**

### **Item:**

**12 KW Hybrid Solar Power Plant**

* Supply
* Installation
* Commissioning
* Testing

**Quantity:** *Lumpsum package*
(Detailed technical specifications are provided in Annexure-V — not included in this extract.)

# **4. Important Tender Instructions (Page 2)**

### **Mandatory Requirements**

* Bidders must be registered on **CPP Portal** (eProcure).
* Must have a **valid Digital Signature Certificate (DSC)**.
* Bids accepted only through online submission.
➤ *No email/post/courier/hand submission allowed.*

### **Disclaimer**

ICAR-CIARI is **not responsible** for:

* Delays in bidder registration
* Uploading failures
* Technical issues on bidder side

### **Corrigendum Policy**

Any modifications to the tender (date extensions, corrections) will be uploaded **only on the websites**.
➡ No newspaper publication will be issued.

### **EMD Exemption**

MSMEs and Start-ups (registered with DIPP/DPIIT) are exempted from EMD **with valid documentary proof**.

# **5. Issuing Authority**

Signed by:
**Administrative Officer, ICAR-CIARI**
For **Director, ICAR-CIARI**