1. Home
  2. Tenders
  3. DG Sashastra Seema Bal issue Tender fo SITC Off-GridSolar Power Station of 31st Bn Gossaigaon – EQ
DG Sashastra Seema Bal issue Tender fo SITC Off-GridSolar Power Station of 31st Bn Gossaigaon – EQ

DG Sashastra Seema Bal issue Tender fo SITC Off-GridSolar Power Station of 31st Bn Gossaigaon – EQ

0
0

Summary:

# đź“‘ Scope of Work

* **Project:** Supplying, installation, testing, and commissioning of **15 KWP Off-Grid Solar Power Stations** at **eight BOPs**: Bangaon, Moulakhalo, Dudhkholia, Balujhora, Pebsu, Phekua, Jamduar, and Balatung.
* **Estimated cost:** ₹1,35,75,186/-
* **Earnest Money Deposit (EMD):** ₹2,71,504/-
* **Completion Time:** 180 days.

# đź“… Critical Dates

* **Published:** 17.09.2025
* **Download start:** 17.09.2025 (1830 hrs)
* **Pre-bid conference:** 19.09.2025 (1030 hrs)
* **Bid submission start:** 19.09.2025 (1030 hrs)
* **Bid submission end:** 29.09.2025 (1730 hrs)
* **Bid opening:** 30.09.2025 (1730 hrs).

# ⚖️ Eligibility Criteria

* **Past work:** Must have satisfactorily completed **similar works of SITC of off-grid solar systems ≥7.5 kWp** in Central/State Govt/PSU within last 7 years.
* Options for eligibility:

* 3 works ≥40% of tender amount, OR
* 2 works ≥60% of tender amount, OR
* 1 work ≥80% of tender amount.
* Past performance, solvency, and bank guarantee (≥50% of estimated cost) also required.

# đź“‹ Key Conditions

* **Tender type:** Online only via [eprocure.gov.in](https://www.eprocure.gov.in).
* **Digital signature:** Class-III DSC mandatory.
* **Bid validity:** Must include all taxes; rates quoted in **both figures and words**.
* **Documents required:** EMD receipt, GST registration, PAN, solvency certificate, financial statements (last 5 years), Integrity Pact, Affidavit (per CPWD-6), work experience, and educational certificates for technical staff.

# đźš« Grounds for Rejection

The bid will be invalid if:

* Bidder fails eligibility.
* Original EMD/solvency certificate not deposited.
* Scanned copies of all documents not uploaded.
* Discrepancies between uploaded and hard copies.

# 📌 Notes

* GST or other taxes applicable on inputs must be borne by contractor.
* Govt will not entertain claims for variations in tax rates post bid.
* Tenderers must ensure **legible and complete uploads**.
* Modifications/addendums will only be published on eprocure.gov.in, not newspapers.

For more information please see below link:

Anand Gupta Editor - EQ Int'l Media Network