DVC issue Tender for DEETC of Floating System Arrangements for 14 MW AC Grid Tied Floating Solar PV Plant on the Raw Water Reservoir at DVC MTPS, Mejia – EQ
Summary:
—
### 📌 Project Overview
* **Tender No.:** CVD9579P25
* **Authority:** Oil India Limited (OIL)
* **Work:** Engineering, Procurement & Construction (EPC) of **10 MWp Solar PV Power Project** at OIL’s operational locations.
* **Scope:** Includes **Design, Engineering, Supply, Erection, Testing, Commissioning & 10 years O\&M** of the solar project.
* **Completion Time:** 12 months for commissioning + 10 years O\&M.
—
### ⚡ Eligibility Criteria
1. **Technical:**
* Bidder must have executed EPC of at least **one 5 MWp (or above) grid-connected solar project** in India in the last 7 years.
* Project must have been in successful operation for at least 1 year.
2. **Financial:**
* Average annual turnover (last 3 financial years) ≥ **₹50 crore**.
* Positive net worth required.
* Working capital ≥ **₹10 crore** (with CA certificate/Banker’s certificate).
3. **Consortium/Joint Venture:** Not allowed. Only single bidders permitted.
—
### 💰 Bid & Security Details
* **Bid Security (EMD):** ₹1 crore.
* **Performance Security:** 10% of contract value (valid up to O\&M period).
* **Price Basis:** Firm and fixed – no escalation allowed.
* **Contract Type:** Lump-sum turnkey (EPC + O\&M).
—
### 📑 Bid Submission
* **Mode:** e-Tendering through OIL’s portal.
* **Start Date:** 28.08.2025
* **Last Date of Submission:** 30.09.2025 (11:00 hrs).
* **Bid Opening (Technical):** 30.09.2025 (14:00 hrs).
* **Bid Validity:** 120 days from closing date.
—
### ⚠️ Key Conditions
* Solar PV modules must be **indigenously manufactured** (Make in India compliance).
* EPC contractor must arrange all statutory approvals (CEA, DISCOM, CEIG, etc.).
* Minimum CUF (Capacity Utilisation Factor) guarantee applicable; shortfall → penalties.
* Liquidated damages for delay in commissioning.
* O\&M must ensure >95% plant availability.
—
### ✅ Takeaway
Oil India Ltd is inviting EPC contractors to develop a **10 MWp solar PV project** on a turnkey basis, including **10 years O\&M**. Bidders need proven experience in **≥5 MW solar EPC**, strong financials (₹50 Cr turnover), and must comply with **Make in India** guidelines.
—