e-RA Result-RUMSL Morena Tender (Phase-1) – EQ
Summary:
* **Total Bidders Participated:** 14
(Including NTPC Renewable Energy, Adani Renewable, ReNew, ACME Solar, Engie, Ampin Energy, etc.)
* **Units & Start Prices:**
* **Unit-1:** Start price – 315 paise/kWh
* **Unit-2:** Start price – 325 paise/kWh
* **Unit-1 Final Auction Results:**
* **L1 (Lowest Bidder):** **CEIGALL India Ltd.** – 270 paise/kWh
* Other competitive bidders included Purvah Green (270.5), Waaree Forever Energies (273.2), Apraava (275.4), Ampin (276.5), Dilip Buildcon (280.1), and Serentica Renewables (295).
* **Unit-2 Final Auction Results:**
* **L1 (Lowest Bidder):** **ACME Solar Holdings Ltd.** – 276.4 paise/kWh
* Other competitive bids: Ceigall (276.5), Purvah Green (278.7), Dilip Buildcon (279.9), Engie (280), Shivalaya Construction (301), MB Power (308), Waaree Forever (322).
### **Key Takeaways**
* **CEIGALL India Ltd.** won **Unit-1** at the lowest tariff of **270 paise/kWh**.
* **ACME Solar Holdings Ltd.** won **Unit-2** at the lowest tariff of **276.4 paise/kWh**.
* The tender saw strong participation from major renewable developers, with aggressive tariffs well below the starting prices.
—–
For more information please see below link:
Related posts:
- Final Bidder List For RUMSL Agar Solar Park Tender
- Final Bidders List For RUMSL 450 MW Shajapur Solar Park Projects Bid
- Bidders List At RUMSL Neemuch Solar Park Bid
- Inviting online bids from eligible parties on Single Stage Two Envelope Bidding basis for selection of developer(s) for Grid Connected WindSolar Hybrid Power Project(s) of 750 MW in the state of MP – EQ Mag Pro


