Featured January 27, 2020 Anand Gupta 0 Likely Installed capacity by the end of 2029-30 0 0 0 00 0 0 more now viewing Likely Installed capacity by the end of 2029-30 January 27, 2020 Anand Gupta now playing Petition of the CERC (Terms and Conditions of Tariff) Regulations for determination of tariff for the inter-state transmission lines for the 2024-29 tariff period - EQ January 27, 2020 Anand Gupta now playing Petition for Adoption of tariff of 1200 MW Wind-solar hybrid power projects with Greenshoe option to connected the Inter-State Transmission System of the Ministry of Power, Government of India from time to time - EQ January 27, 2020 Anand Gupta now playing Petition for Adoption of Tariff for the ISTS Grid connected Solar Power projects of 1200 MW with “Greenshoe Option” by Ministry of Power, Govt. of India (NHPC Tranche-IX) - EQ January 27, 2020 Anand Gupta now playing Northern Railways issue Tender for setting up grid-connected solar projects in the Firozpur division of Punjab - EQ January 27, 2020 Anand Gupta now playing WBSEDCL issue Tender for the development of a large-scale 500 MW / 2,000 MWh standalone Battery Energy Storage System - EQ January 27, 2020 Anand Gupta now playing SECI issue Tender for Supply of 80 MW Power on Short-Term Basis Through Tariff-Based Competitive Bidding - EQ January 27, 2020 Anand Gupta now playing CPWD issue Tender for Provision of Solar Panels at various locations at Coast Guard Headquarters/ ICGS, Delhi - EQ January 27, 2020 Anand Gupta now playing India’s Power Consumption Rises 1.8% to 149.56 Billion Units in March Amid Moderate Demand Growth - EQ January 27, 2020 Anand Gupta now playing Green Hydrogen Blending Can Reduce India’s Gas and Fuel Import Dependence: Pralhad Joshi - EQ January 27, 2020 Anand Gupta now playing UT Releases ₹3.80 Crore Subsidy to 4,288 Households Under PM Surya Ghar Scheme, Boosting Rooftop Solar Adoption - EQ January 27, 2020 Anand Gupta Likely Installed capacity by the end of 2029-30 For more information please see below link: Related posts: Andhra Pradesh issues combined amendments to its solar, wind and, solar-wind hybrid policy Solar May Not Get Relief From Trump’s Tariffs Soon After All A global assessment of net zero targets Sterling & Wilson Solar promoter Daduvala offloads 5% stake worth ₹200 crore tags: SOLAR 0 00 0 0 previous Andhra Pradesh government plans 10,000 MW solar project next EXTENSION OF BID SUBMISSION DATE: 1200 MW ISTS CONNECTED WIND POWER PROJECTS (TRANCHE-IX) Anand Gupta Editor - EQ Int'l Media Network Related Posts NewEnergie Renewables Limited Achieves Major Milestone: Over 500 MW of Solar Trackers Installed, Redefining Solar Energy Generation – EQ April 2, 2026 Anand Gupta 0 NewEnergie Renewables Limited Achieves 500 MW Milestone, Redefining Solar Energy Generation – EQ April 2, 2026 Anand Gupta 0 Proposal for Implementation of a pilot Contract for Difference (CfD) Scheme for Renewable Energy- reg. – EQ April 2, 2026 Anand Gupta 0 LEAVE YOUR COMMENT Cancel replyYour email address will not be published. Required fields are marked *