#### **1. PROJECT DETAILS**
| Item | Description |
|——|————-|
| **Work Name** | Completion of Incomplete Work (Manning & Operation under Phase-II) against CA No. CE (AF)ALDI/IZN/61 of 2017-18 – Provision of Solar Power Generating System at AF Station Bareilly |
| **Estimated Cost** | ₹52.29 Lakh (AI Par Market) |
| **Completion Period** | 24 months & 7 days |
| **Type of Contract** | Item Rate Contract based on IAFW 1779-A with BOQ; GCC as per IAFW-2249 |
—
#### **2. ELIGIBILITY CRITERIA**
* **For MES Enlisted Contractors:**
* Must be enlisted in **Class ‘C’** and **Category ‘d(v)’**.
* Must have satisfactory performance remarks in Work Load Return (WLR).
* **For Un-enlisted Contractors:**
* Must meet the enlistment criteria for Class ‘C’, Category ‘d(v)’ MES contractors.
* Must have satisfactorily completed works of similar nature and value.
* Must provide proof of:
* Annual turnover, bank solvency, working capital.
* Immovable property/fixed assets, T&P, engineering establishment.
* No outstanding recoveries in any Govt. department.
* Police verification/valid passport for proprietor/partners/directors.
* **Not suspended/debarred/blacklisted** by any Central/State Govt./PSU.
* Foreign firms **not eligible**. Indian firms with foreign directors require security clearance.
* Un-enlisted contractors already executing MES works **must not exceed twice** the tendering limit of their eligible class.
—
#### **3. TENDER PROCESS & SUBMISSION**
| Stage | Detail |
|——-|———|
| **Tender Document Cost** | ₹1000/- via DD/Banker’s Cheque in favour of GE (AF) Bareilly. |
| **Bid Format** | **Cover-1 (Technical Bid):** Eligibility documents, EMD, tender cost DD.<br>**Cover-2 (Financial Bid):** Priced BOQ. |
| **Key Dates (P = Publishing Date)** | Start: P+21 days @ 1800 Hrs<br>Submission End: P+26 days @ 1800 Hrs<br>Bid Opening: P+33 days on/after 1100 Hrs |
| **EMD Amount** | ₹1,03,440.00 via **Call Deposit Receipt** (FDR not accepted) in favour of GE (AF) Bareilly. |
| **Submission Portal** | www.eprocuremes.gov.in |
—
#### **4. IMPORTANT CONDITIONS & CLAUSES**
* **Single Bid per Firm:** Only one bid allowed per contractor/firm.
* **Anti-Collusion:** Father-son/close relatives/firms with common partners **cannot bid separately**. Breach leads to rejection of both bids.
* **Site & Document Inspection:**
* Bidders advised to inspect site & samples at GE/AGE(I) office by prior appointment.
* Submission implies full knowledge of site, documents, and conditions.
* **Alterations to Conditions:** Any bid proposing changes to conditions is liable for rejection.
* **Acceptance of Tender:** Accepting Officer **not bound** to accept lowest or any bid. No reasons required for rejection.
* **Price Preference:** Preference may be given to Public Undertakings/SMEs as per Govt. policy, even if their bid is not lowest.
* **Subletting:** Work **cannot be sublet** or executed via attorney to third parties. Can be executed through POA to family members/firm employees if they do not have a separate enlisted firm.
—
#### **5. DOCUMENT REQUIREMENTS**
* **Enlisted Contractors (Cover-1):**
* Application on letterhead.
* Valid enlistment letter.
* Scanned DD for tender cost & EMD (if SSD bond not signed).
* **Un-enlisted Contractors (Cover-1):**
* Application on letterhead.
* Scanned DD for tender cost & EMD.
* Police Verification/Passport copies.
* All documents per MES Manual on Contracts 2020 for enlistment.
* Details of ongoing MES works (if any).
—
#### **6. POST-SUBMISSION PROCESS**
* **Physical Document Submission:** Original DDs/EMD instruments must reach Accepting Officer **within 7 days** of bid submission end date. Failure leads to:
* **Enlisted:** Financial bid opened but firm banned for 6 months.
* **Un-enlisted:** Financial bid **not opened** & firm barred for 6 months.
* **Deficiency Rectification:** If deficiencies found in Cover-1, contractor given **7 days** to rectify via email/SMS. Failure → Financial bid not opened.
* **Technical Bid Validation:** Accepting Officer can reject any technical bid. Rejected bidders can appeal to NHEA (HQ Chief Engineer (AF) Prayagraj Zone) before Cover-2 opening.
—