NHPC Issues Tender for 30.93 MW Rooftop Solar Capacity in Haryana – EQ
Summary:
—
The projects will be implemented across **20 districts**, including Ambala, Faridabad, Karnal, Panchkula, Rewari, Rohtak, Gurugram, Hisar, Jhajjar, Jind, Kaithal, Kurukshetra, Mahendragarh, Palwal, Panipat, Sirsa, Yamunanagar, Sonipat, Fatehabad, and Bhiwadi .
### Key Bid Details
| Parameter | Details |
|———–|———|
| **Total Capacity** | 30.93 MW (cumulative across all districts) |
| **Location** | Government buildings across 20 districts of Haryana |
| **Bid Submission Deadline** | April 22, 2026 |
| **Bid Opening Date** | April 24, 2026 |
| **Project Completion Timeline** | 9 months from signing of Power Purchase Agreement (PPA) |
| **Tender Fee** | ₹1,000–₹5,000 (varies by district) |
| **Earnest Money Deposit (EMD)** | ₹100,000 – ₹380,000 (varies by district) |
| **Project Management Consultancy Charge** | ₹1,350/kW (additional) |
| **Performance Security** | ₹2,250/kW |
### Scope of Work
The selected developer’s scope of work includes :
– Design and engineering of rooftop solar systems
– Procurement of equipment and materials
– Installation, testing, and commissioning
– Operation and maintenance (O&M) of the systems
– Obtaining all necessary permits and approvals
### Eligibility Criteria
Bidders must meet the following financial requirements :
| Criteria | Requirement |
|———-|————-|
| Net Worth | Minimum ₹9,000/kW |
| Turnover | Minimum ₹4,500/kW |
| Profit Before Depreciation, Interest, and Taxes (PBDIT) | Minimum ₹900/kW |
| Line of Credit | Minimum ₹1,125/kW |
### Make in India Requirement
The tender mandates a **minimum of 50% local content** for Class-I suppliers, aligning with the Public Procurement (Preference to Make in India) Order .
Related posts:
- NHPC Issue Tender for Supply of 700 KW Solar Power Plant inside the Campus of Central University of Rajasthan – EQ Mag
- SJVN Ltd issue Tender for (RfS) of Solar Rooftop Power Developers for 5.1 MW Grid connected Rooftop Solar PV Power Projects in the Southern Region RESCO mode under PMSGMBY – EQ
- SJVN Ltd issue Tender for setting up of 3.3 MW Grid connected Rooftop Solar PV Power Projects in the Southern Region states under RESCO mode PMSGMBY – EQ
- SJVN Ltd issue Tender for setting up of 3.3 MW Grid connected Rooftop Solar PV Power Projects in the Southern Region states under RESCO mode PMSGMBY – EQ


