Petition for Adoption of Transmission Charges with “Transmission System for Evacuation of RE Power from Raghanesda Area of Gujarat – 3 GW under Phase-I” – EQ
Summary:
# CERC — RoP in Petition No. 724/AT/2025 & 725/TL/2025
* **Project:** “Transmission System for Evacuation of RE Power from **Raghanesda Area, Gujarat – 3 GW (Phase-I)**.”
* **Petitioner:** **Raghanesda RE Transmission Ltd. (RRTL)**; **Respondents:** **CTUIL & Ors.**
* **Statutes/Regs:** **Sec. 63** (Adoption of transmission charges) and **Secs. 14 & 15** (Transmission licence) read with **CERC Transmission Licence Regulations, 2024**.
* **Hearing:** **28-Aug-2025**; **Coram:** Chairperson Shri Jishnu Barua; Members Shri Ramesh Babu V., Shri Harish Dudani, Shri Ravinder Singh Dhillon.
* **Parties present:** Varun Sharma, Kanika Rai, Biswas Barik (RRTL); Deepak Kumar (PFCCL). 
## Orders
1. **Both petitions admitted; notices issued.**
2. **Replies** from Respondents **within 2 weeks** (by **11-Sep-2025**); **Rejoinder(s)** by RRTL **within 2 weeks thereafter** (by **25-Sep-2025**).
3. **Petition 724/AT/2025:** **BPC** to file an **affidavit within 2 weeks** explaining why **discovered transmission charges = ₹2,328.71 million** are **34.54% lower** than estimated annual levelized charges under prevailing CERC norms.
4. **Petition 725/TL/2025:** **CTUIL** to file an **affidavit within 2 weeks** enclosing documents declaring **Raghanesda** as a **potential RE zone**.
5. **Next listing/hearing:** **25-Sep-2025** (tomorrow, Asia/Kolkata). 
## Quick action checklist (as of 24-Sep-2025)
* ✅ Respondents’ **replies** were due **11-Sep-2025**.
* ✅ **BPC affidavit** due **11-Sep-2025** (on lower discovered charges).
* ✅ **CTUIL affidavit** due **11-Sep-2025** (RE-zone docs).
* ⌛ **RRTL rejoinder(s)** due **25-Sep-2025**, i.e., by the next hearing. 
For more information please see below link:
Related posts:
- Petition for Adoption of Transmission Charges to the Transmission System being established by the Barmer I Transmission Limited – EQ
- Petition for Adoption of Transmission Charges with Transmission System being established by the Kudankulam ISTS Transmission Limited – EQ
- Petition for Adoption of Transmission Charges to the Transmission System being established by Pune – III Transmission Limited – EQ
- Petition for Adoption of Transmission Charges to the Transmission System being established by Khavda V-B1B2 Power Transmission Limited – EQ