Petition for determination of the capital cost and transmission tariff at Warangal New Substation Transmission System constructed, maintained and operated – EQ
Summary:
—
## **Case Summary – Warora Kurnool Transmission Ltd. (WKTL)**
**Forum:** Central Electricity Regulatory Commission (CERC), New Delhi
**Petition No.:** 102/TT/2025
**Date of Hearing:** 19 August 2025
**Coram:**
* Jishnu Barua, Chairperson
* Ramesh Babu V., Member
* Harish Dudani, Member
* Ravinder Singh Dhillon, Member
—
### **1. Case Background**
* **Petitioner:** Warora Kurnool Transmission Limited (WKTL)
* **Respondents:** TANGEDCO, PGCIL & 13 others
* **Nature of Petition:**
* Determination of **capital cost and transmission tariff** for **FY 2024–25 to FY 2028–29**.
* Asset: One **spare 1-phase 80 MVAR reactor** at **765 kV Warangal New Sub-station Transmission System**, constructed and operated by WKTL (under Licence No. 79/Transmission/2022/CERC).
—
### **2. Proceedings**
* Petitioner sought **3 weeks’ extension** to file information earlier directed in RoP dated 29.05.2025.
* Commission allowed extension; directed Petitioner to file required information by **affidavit within 3 weeks**.
* **TANGEDCO** has filed its reply.
* Petitioner has not yet filed a rejoinder.
—
### **3. Commission’s Directions**
* Petitioner to file missing information (per 29.05.2025 RoP) by affidavit within 3 weeks.
* Petitioner to file **rejoinder** to TANGEDCO’s reply.
* All parties directed to file **written submissions within 2 weeks** (with copy to opposite party).
* **Next hearing scheduled on 21.10.2025.**
—
### **4. Outcome**
* **Type of Order:** Procedural (Record of Proceedings).
* **Effect:** Information & rejoinder pending; procedural timelines set.
* Final determination of tariff will depend on compliance at next hearing.
—
For more information please see below link:
Related posts:
- Petition for Truing Up and determination of transmission tariff for the Itarsi- Dhule Transmission Line at Khandwa” in the Western Region – EQ
- Petition for Truing Up and determination of transmission tariff for the Combined Asset Transmission System associated with “System Strengthening Scheme” in the Northern Region – EQ
- Petition for Truing Up of and determination of transmission tariff for the S/C Kankroli-Jodhpur Transmission Line in the Northern Region – EQ
- Petition for Truing up and determination of transmission tariff for the “Combined Asset under ERSS-IV” in the Eastern Region – EQ