Petition for seeking permission to allow drawal of start-up power for Unit-I (800 MW) of Telangana Ph-I (2X800 MW) from the grid – EQ
0
0
Petition for seeking permission to allow drawal of start-up power for Unit-I (800 MW) of Telangana Ph-I (2X800 MW) from the grid
For more information please see below link:
Related posts:
- Petition for approval of tariff for the period from 30.9.2019 to 31.3.2024 for Khargone Super Thermal Power Station (1320 MW) – EQ Mag Pro
- Petition for approval of tariff of Korba STPS Stage-I & Stage-II (2100 MW) for the period from 1.4.2019 to 31.3.2024. NTPC Limited – EQ Mag Pro
- Petition for revision of tariff of Loktak Hydroelectric Power Station (105 MW) NTPC Limited – EQ Mag Pro
- Petition for determination of project specific levelised tariff for 92 MW floating solar Photo Voltaic Plants in two phases (first phase 22 MW and second phase 70 MW) – EQ Mag Pro


