1. Home
  2. Policy & Regulation
  3. Petition for Truing Up and determination of transmission tariff for the Line under “Transmission system associated with Kalpakkam PFBR (500 MW) project” in the Southern Region – EQ
Petition for Truing Up and determination of transmission tariff for the Line under “Transmission system associated with Kalpakkam PFBR (500 MW) project” in the Southern Region – EQ

Petition for Truing Up and determination of transmission tariff for the Line under “Transmission system associated with Kalpakkam PFBR (500 MW) project” in the Southern Region – EQ

0
0
Anand Gupta Editor - EQ Int'l Media Network