Petition of the CERC (Grant of Connectivity, Long Term Access and Medium Term Open Access in inter State transmission and related matters) Regulations of long term access granted on the existing ISTS – EQ
0
0
Petition of the CERC (Grant of Connectivity, Long Term Access and Medium Term Open Access in inter State transmission and related matters) Regulations of long term access granted on the existing ISTS
For more information please see below link:
Related posts:
- Petition of the CERC (Open Access in inter-State Transmission) Regulations, 2008 – EQ
- Petition of the CERC (Grant of Connectivity, Long-Term Access and Medium Term Open Access in inter-State transmission and related matters) Regulations, 2009 – EQ
- Petition of the CERC (Open Access in Inter-State Transmission) and RERC (Intra-State ABT) Regulations – EQ
- Petition of the CERC (Sharing of inter- State Transmission Charges and Losses) and (Deviation Settlement Mechanism and related matters) Regulations, 2022 – EQ


