Featured March 10, 2021 Anand Gupta 0 SBI – WORLD BANK: GRID CONNECTED ROOFTOP SOLAR PV PROGRAM 0 0 0 00 0 0 more now viewing SBI – WORLD BANK: GRID CONNECTED ROOFTOP SOLAR PV PROGRAM March 10, 2021 Anand Gupta now playing Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time - EQ March 10, 2021 Anand Gupta now playing Petition for Truing up and determination of the transmission tariff for Combined Asset under “North Eastern Region Strengthening Scheme-IV” in the North Eastern Region - EQ March 10, 2021 Anand Gupta now playing Petition for determination of the Transmission Tariff for the Transmission Assets under Transmission System Strengthening Scheme for evacuation of power from Solar Energy Zones in RJ - EQ March 10, 2021 Anand Gupta now playing Gujarat Green Hydrogen Project Policy 2025 - EQ March 10, 2021 Anand Gupta now playing Final Renewable Energy Gujarat Policy 2025 - EQ March 10, 2021 Anand Gupta now playing MES issue Tender for Provn of Roof Top Solar Plants at Bathinda, Faridkot, Lalgarh Jattan, Abohar and Fazilka - EQ March 10, 2021 Anand Gupta now playing TIFR issue Tender for DSITC of On-grid rooftop solar power plant at the main building terrace - EQ March 10, 2021 Anand Gupta now playing Uninterrupted Power Supply Benefits 1.25 Lakh Households in Srinagar, Says CM Abdullah - EQ March 10, 2021 Anand Gupta now playing No Final Decision Taken on Power Sector Privatisation, Says UP Energy Minister - EQ March 10, 2021 Anand Gupta now playing Lower, Fixed Transaction Fee Structure for Power Exchanges Under Consideration - EQ March 10, 2021 Anand Gupta SBI – WORLD BANK: GRID CONNECTED ROOFTOP SOLAR PV PROGRAM For more information please see below link: Download [124.13 KB] Related posts: Banks seeing credit demand from solar, oil & gas and road: SBI Chairman SBI raises $100 million via green bonds amid COVID-19 scare Punjab National Bank extends moratorium to NBFC SBI Agrees To Extend Moratorium To NBFCs tags: SBI 0 00 0 0 previous 40% BCD on Solar Modules & 25% on Solar Cells With Effect from April 01, 2022 without Grandfathering of Existing Bid-Out Projects next Energy Industry: Disruption will drive companies to improve operational efficiency Anand Gupta Editor - EQ Int'l Media Network Related Posts Gujarat Green Hydrogen Project Policy 2025 – EQ December 25, 2025 Anand Gupta 0 Final Renewable Energy Gujarat Policy 2025 – EQ December 25, 2025 Anand Gupta 0 Government Driving National Green Hydrogen Mission Forward with Whole-of-Government Coordination – EQ December 25, 2025 Anand Gupta 0