1. Home
  2. Tenders
  3. SJVN Ltd issue Tender for Setting up of 2.4 MW Grid connected Rooftop Solar Power Projects of Arunachal Pradesh under RESCO/PPA mode – EQ
SJVN Ltd issue Tender for Setting up of 2.4 MW Grid connected Rooftop Solar Power Projects of Arunachal Pradesh under RESCO/PPA mode – EQ

SJVN Ltd issue Tender for Setting up of 2.4 MW Grid connected Rooftop Solar Power Projects of Arunachal Pradesh under RESCO/PPA mode – EQ

0
0

Summary:

## πŸ“Œ Case Overview

* **Authority:** Military Engineer Services (MES)
* **Tender Inviting Officer:** Garrison Engineer (East), Ranchi
* **Work Title:** Provision of **50 kW Rooftop Solar Plant** at β€œBuilding No. P-6”, Ranchi
* **Estimated Cost:** β‚Ή39.80 lakhs (approx.)
* **Completion Period:** 180 days
* **Tender Document Cost:** β‚Ή1,000/- (to be paid online)
* **Earnest Money Deposit (EMD):** β‚Ή79,600/-

## ⚑ Project Details

* Installation of a **50 kW rooftop solar power plant** on a designated building.
* Work to be executed by **GE (East) Ranchi**.
* Includes supply, installation, testing, and commissioning of solar panels and balance of system.

## πŸ’° Eligibility & Contractor Criteria

1. **MES Enlisted Contractors:**

* Minimum **Class β€˜D’ and above**, with satisfactory record.
* Must have MoU with approved solar power firms rated **1A/1B/1C/2A/2B/2C** by CRISIL/CARE/ICRA/FITCH/SMERA/Brickwork.

2. **Un-enlisted Contractors:**

* Must meet MES enlistment criteria of Class β€˜D’.
* Experience in Govt./PSU works with credentials in solar EPC.
* Same MoU requirement with rated solar firms unless rated themselves.
* Should not be blacklisted/suspended.

3. **Experience Requirement:**

* Completed and commissioned solar plants in Govt./PSU in the last 7 years:

* One work β‰₯ 40 kW (80%) OR
* Two works β‰₯ 25 kW (50%) OR
* Three works β‰₯ 20 kW (40%).

## πŸ›οΈ Key Tender Conditions

* Two-cover system (Technical & Financial bids) applies.
* EPC work cannot be sublet (except close relatives or firm’s employee with power of attorney).
* EMD and tender fee must be submitted online before bid opening.
* Non-compliance may result in rejection of bids.
* Preference policy applicable to MSMEs/public enterprises.

## βœ… Outcome / Next Steps

* Tender floated for **50 kW rooftop solar plant in Ranchi** with 6-month completion time.
* Evaluation will be done on eligibility + lowest financial bid.
* Final acceptance lies with the **Commander Works Engineer, Ranchi**.

For more information please see below link:

Anand Gupta Editor - EQ Int'l Media Network