1. Home
  2. Tag "10 MW"

REIL issue Tender for SDSETC and Comprehensive O&M for 25Y of 10 MW Grid Connected Rooftop Solar PV Power Project on State Govt buildings State Govt undertaking buildings in Raj – EQ

Summary: — # **1. Purpose of the Tender** The tender seeks **qualified contractors** to execute civil works related to **water resources infrastructure**, such as construction, repair, or improvement activities. The works are categorized under a **single Bid Identification Number – 11 WR/MID ASKA/2024-25**, which includes **three separate works**. Each work has an estimated cost below […]

WBSEDCL issue Tender for Selection of Consulting Services for DEPSICTC including warrantee obligation with 5 Yrs, O&M of a 100 MW (AC) Solar PV Power Plant and 52 MWh BESS at Goaltore, Paschim Medinipur, West Bengal – EQ

Results : O&M contract including Insurance for Five Years of 10 MW Ground Mounted Solar Power Project at Badi Sid, Rajasthan – EQ

Summary: — ### **Document Title:** **Results β€” Operation & Maintenance (O&M) Contract Including Insurance for 5 Years of 10 MW Ground Mounted Solar Power Project at Badi Sid, Rajasthan** — ### **Issuing Authority:** **Solar Energy Corporation of India Ltd. (SECI)** **Tender No:** SECI/C&P/OP/11/019/2024-25 — ### **Purpose of the Tender:** The tender was issued for the […]

Strategies for Resilience – Ensuring Renewable Power Systems’ Readiness to Face Extreme Weather – EQ

NTPC Ltd issue Tender for AMC of SCADA System at 10MW Solar PV Plant Ramagundam for 2 years – EQ

Summary: — ## πŸ“Œ Project Overview * **Authority:** NTPC Limited, Unified Shared Services Center – CPG-3 (Raipur). * **Work Title:** AMC (Annual Maintenance Contract) of **SCADA System** at **10 MW Solar PV Plant, Ramagundam**. * **Contract Duration:** 2 years (24 months) from contract start date. * **Extension:** Up to 3 months possible, on same terms […]

WBSEDCL issue Tender for Selection of Consulting Services for DEPSICTC including warrantee obligation with 5 Yrs, O&M of a 100 MW (AC) Solar PV Power Plant and 52 MWh BESS at Goaltore, Paschim Medinipur, West Bengal – EQ

Petition of the Electricity Act of 10 MW Solar Photovoltaic Grid cnnected Power Projects located at Anida, District Bhavnagar established by GSECL – EQ

Summary: — ## **Case Summary – Gujarat State Electricity Corporation Ltd. (GSECL) vs. Gujarat Urja Vikas Nigam Ltd. (GUVNL)** **Forum:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar **Petition No.:** 2505 of 2025 **Order Date:** 08 August 2025 **Coram:** * Mehul M. Gandhi, Member * S.R. Pandey, Member — ### **1. Case Background** * **Petitioner:** Gujarat State […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Petition of the Electricity Act of 10 MW Solar Photovoltaic Grid connected Power Projects located at Paravadi, District Bhavnagar established by GSECL – EQ

Summary: — ## **Case Summary – Gujarat State Electricity Corporation Ltd. (GSECL) vs. Gujarat Urja Vikas Nigam Ltd. (GUVNL)** **Forum:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar **Petition No.:** 2506 of 2025 **Order Date:** 08 August 2025 **Coram:** * Mehul M. Gandhi, Member * S.R. Pandey, Member — ### **1. Case Background** * **Petitioner:** Gujarat State […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

SECI issue Tender for O&M contract including Insurance for 5 Years of 10 MW Ground Mounted Solar Power Project at Badi Sid, Rajasthan – EQ

SECI issue Tender for O&M contract including Insurance for 5 Years of 10 MW Ground Mounted Solar Power Project at Badi Sid, Rajasthan For more information please see below link:

WBSEDCL issue Tender for Selection of Consulting Services for DEPSICTC including warrantee obligation with 5 Yrs, O&M of a 100 MW (AC) Solar PV Power Plant and 52 MWh BESS at Goaltore, Paschim Medinipur, West Bengal – EQ

West Bengal Launches Tender for 10 MW Rooftop Solar Rollout Across Five Regions – EQ

In Short : The West Bengal Renewable Energy Development Agency has invited bids for 10β€―MW of rooftop solar installations across five regions, including Kolkata, central, southern, northern, and hilly areas. The tender covers design, supply, installation, net metering, and five years of operations and maintenance. Bids are due by August 14, 2025, with specified earnest […]

Gujarat Launches Integrated Renewable Energy Policy 2025 to Boost Green Energy and Grid Stability – EQ

Texmaco Rail Powers Ahead with 10 MW Solar Plant to Drive Green Manufacturing in Raipur – EQ

In Short : Texmaco Rail & Engineering Ltd has commissioned a 10β€―MW captive solar power plant in Raipur, Chhattisgarh, in partnership with AMP Energy India. The plant will generate over 15β€―million units annually, cutting COβ‚‚ emissions by 12,000+ tonnes. Developed under the group captive model, it will reduce electricity costs by 30–40% and significantly lower […]

REMCL Awards 10-Year O&M Contract to POWERCON for Rajasthan Wind Power Project – EQ

Pre-bid meeting: O&M contract including Insurance for 5 Years of 10 MW GMSP Project at Badi Sid, Rajasthan – EQ

Pre-bid meeting: Operation & Maintenance contract including Insurance for 05 (Five) Years of 10 MW Ground Mounted Solar Power Project at Badi Sid, Rajasthan. Pre-bid meeting for the tender has been scheduled as per following details: Date & Time: 22.07.2025 at 11:00 AM (IST). Mode of meeting: Online mode Pre-bid meeting link: https://teams.microsoft.com/l/meetup-join/19%3aXTet8N6xkE_6eHvy05IhHjREk102bgbYd2exX2o-3pU1%40thread.tacv2/1752643586638?context=%7b%22Tid%22%3a%22a24b3e19-3a1f-4c61-9f1e-cace38462ab7%22%2c%22Oid%22%3a%225164b124-35cd-46f3-97d9-6f9cc331e98c%22%7d If you […]

Strategies for Resilience – Ensuring Renewable Power Systems’ Readiness to Face Extreme Weather – EQ

Petition of the CERC (Indian Electricity Grid Code) Regulations of Wind Turbine Generators (WTGS) in tranches of at least 10 MW – EQ

Petition of the CERC (Indian Electricity Grid Code) Regulations of Wind Turbine Generators (WTGS) in tranches of at least 10 MW For more information please see below link:

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ