1. Home
  2. Tag "12.5 MW"

Tata Power Renewable Energy Limited signs 12.5 MW PDA with Supreme Petrochem Limited – EQ

Tata Power Renewable Energy Limited (TPREL), one of India’s leading renewable energy players and a subsidiary of The Tata Power Company Limited has signed a Power Delivery Agreement (PDA) with Supreme Petrochem Limited for a 12.5 MW group captive project through a SPV – TP Saturn Limited. Located in Achegaon, Maharashtra, the plant will generate […]

India’s Power Mix Set for Structural Shift as Thermal Share Slips Below 70% by FY27 – EQ

Tata Power Renewable Energy Limited inks PDA with Endurance Technologies Limited for setting up 12.5 MW Captive Solar Plant – EQ

The plant is estimated to generate 27.5 MUs of power; will cut the CO2 emissions by over 9,125 tonnes/ kWh annually Tata Power Renewable Energy Limited (TPREL), a leading renewable energy player and a subsidiary of The Tata Power Company Limited, has signed a Power Delivery Agreement (PDA) with Endurance Technologies Limited, a leading auto […]

India’s Power Mix Set for Structural Shift as Thermal Share Slips Below 70% by FY27 – EQ

JBP Division West Central Railway Issue Tender for Supply of 12.5 MW rooftop/cop ,solar PV system at 3 division of West central Railway” through public-private partnership (“PPP”) – EQ Mag

JBP Division West Central Railway Issue Tender for Supply of 12.5 MW rooftop/cop ,solar PV system at 3 division of West central Railway” through public-private partnership (“PPP”).     Tender Documents Date and Time of Start of Procurement of Tender Documents 29-Mar-2023 11:00:00 RTZ Corresponding Local Date and Time Not Applicable Date and Time of Closure […]

CPCL,DGM(M&C) issue Tender for Pre-Feasibility Study for Supply of 100 MW RTC Renewable Energy by setting up a combination of Wind and Solar Power Plants – EQ

BHEL Issue Tender for ANNUAL MAINTENANCE AND UP KEEPING OF FIVE MW (5 MW) AND SEVEN POINT FIVE MW (7.5 MW) SOLAR POWER PLANT – EQ Mag

BHEL Issue Tender for ANNUAL MAINTENANCE AND UP KEEPING OF FIVE MW (5 MW) AND SEVEN POINT FIVE MW (7.5 MW) SOLAR POWER PLANT. For more information please see below link:

CPCL,DGM(M&C) issue Tender for Pre-Feasibility Study for Supply of 100 MW RTC Renewable Energy by setting up a combination of Wind and Solar Power Plants – EQ

Petition seeking approval for adoption of tariff discovered for long term procurement of 12.5 MW solar power under Component A – EQ Mag Pro

Petition seeking approval for adoption of tariff discovered for long term procurement of 12.5 MW solar power under Component A. For more information please see below link:

Petition of the DERC (Net Metering for Renewable Energy) Regulations and Commission (Peer to Peer Energy Transaction) Guidelines – EQ