SECI: Selection of 1200 MW ISTS-connected Wind Power Projects in India (SECI-Tranche-XIX) – EQ

Summary: —- **1. Tender Objective & Timeline** * **Purpose:** Selection of 1200 MW Inter-State Transmission System (ISTS)-connected Wind Power Projects in India. * **Tender ID:** SECI/C&P/PP/120013/25-26. * **Key Dates:** * Bid Opening: 15.10.2025 (Techno-commercial) * e-Reverse Auction (e-RA): 04.02.2026 * Letter of Award (LoA) Issued: 10.02.2026 **2. Auction Process & Shortlisting** * **Initial Bids:** 16 […]

KPI Green Energy Limited Successfully Energises 965 MWp Capacity out of its 2.17 GWp Independent Power Producer (IPP) Portfolio – EQ

Accelerating Grid Growth: Hartek’s Multi-State Transmission Expansion Drive – EQ

In Short : Hartek securing ₹7.35 billion worth of transmission infrastructure orders across nine states marks a significant boost to power grid development. The projects strengthen electricity evacuation and distribution networks, supporting renewable energy integration and rising demand. This achievement highlights growing private sector participation in critical infrastructure, contributing to improved grid reliability, energy security, […]

Power Grid Corporation of India Limited Raises FY26 Capex to ₹35,000 Crore, Sets ₹25,000 Crore Capitalisation Target – EQ

NHPC Ltd issue Tender for Development of Power Evacuation Infrastructure for 1200 MW Jalaun Solar Park – EQ

Summary: — ## 1. PROJECT OVERVIEW | **Item** | **Details** | |———|————| | **Name of Work** | Development of Power Evacuation Infrastructure for 1200MW Jalaun Solar Park | | **Scope** | 400kV/33kV PSS-1 & PSS-2 (Part A & B), internal & external 400kV transmission lines, EHV/HV equipment, pooling systems, Park Control & Monitoring, all electrical, […]

NGEL issue Tender for EOI for Procurement of Renewable Energy Power from NUGELs upcoming 100 MW Solar PV Project with 50 MW/200 MWh BESS in the state of U.P – EQ

SECI: Selection of 1200 MW ISTS-connected Solar PV Power Projects with 600 MW/3600 MWh ESS (SECI-ISTS-XXI) – EQ

Summary: —- ### **1. Project Overview** – **Issuing Agency**: Solar Energy Corporation of India Limited (SECI) – **Project**: 1200 MW ISTS-connected Solar PV Power Projects with 600 MW / 3600 MWh Energy Storage System (ESS) – **Reference**: Tender No. SEI-C/AP/PP-11/0006-25-26 dated 19.06.2025 – **Auction Date**: e-Reverse Auction held on 09.01.2026 – **LoA Issued**: 29.01.2026 to […]

KPI Green Energy Limited Successfully Energises 965 MWp Capacity out of its 2.17 GWp Independent Power Producer (IPP) Portfolio – EQ

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Summary: — ### **1. Case Details** – **Petition No.**: 771/AT/2025 – **Subject**: Petition under **Section 63 of the Electricity Act, 2003** for **adoption of tariff** for **1200 MW Wind-Solar Hybrid Power Projects** connected to the **inter-State Transmission System (ISTS)**, selected through competitive bidding. – **Petitioner**: **NTPC Limited** – **Respondents**: **Adani Renewable Energy Holding Twelve Limited […]

In the matter for the Adoption of Transmission Charges to Transmission System by the SR WR Power Transmission Limited – EQ

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS of the Ministry of Power, Government of India, as amended from time to time – EQ

Summary: — #### **1. Case Overview** * **Petition Number:** 771/AT/2025 * **Petitioner:** **NTPC Limited** * **Legal Basis:** Filed under **Section 63 of the Electricity Act, 2003**. This section deals with the adoption of tariff discovered through a transparent process of competitive bidding. * **Subject:** The petition seeks the **adoption of tariff** for **1200 MW Wind-Solar […]

In the matter for the Adoption of Transmission Charges to Transmission System by the SR WR Power Transmission Limited – EQ

Petition for Adoption of Tariff for ISTS Grid connected Solar Power Projects of 1200 MW with 600 MW/2400 MWh ESS and with additional capacity with “Greenshoe Option” -EQ

Summary: — ## **1. Nature of Petition** Petition filed under **Section 63 of the Electricity Act, 2003** seeking: 🔹 **Adoption of tariff** for **1200 MW ISTS-connected Solar Power Projects** 🔹 With **600 MW / 2400 MWh Energy Storage System (ESS)** 🔹 Plus **additional 1200 MW under the “Greenshoe Option”** 🔹 Projects selected through competitive bidding […]

In the matter for the Adoption of Transmission Charges to Transmission System by the SR WR Power Transmission Limited – EQ

Petition for Adoption of 1200 MW Wind-Solar Hybrid Power Projects with Greenshoe Option of the Ministry of Power, Government of India, as amended from time to time – EQ

Summary: — ### **1. Background** **NTPC Limited (NTPCL)** filed a petition before the **Central Electricity Regulatory Commission (CERC)** under **Section 63 of the Electricity Act, 2003** seeking **adoption of tariff** for **1200 MW Wind-Solar Hybrid Power Projects**, with a **Greenshoe Option** for an additional capacity of up to **600 MW**. The projects are connected to […]

In the matter for the Adoption of Transmission Charges to Transmission System by the SR WR Power Transmission Limited – EQ

Petition for Adoption of Tariff for Setting up of 1200 MW ISTS-connected Solar PV Power Projects with ESS anywhere in India – EQ

Summary: — ## ⚖️ **Case Overview** **Issuing Authority:** Central Electricity Regulatory Commission (CERC), New Delhi **Petition No.:** 828/AT/2025 **Date of Hearing:** 1 October 2025 **Coram:** * Shri Jishnu Barua, Chairperson * Shri Ramesh Babu V., Member * Shri Harish Dudani, Member * Shri Ravinder Singh Dhillon, Member **Petitioner:** SJVN Limited **Respondents:** SAEL Industries Limited & […]

In the matter for the Adoption of Transmission Charges to Transmission System by the SR WR Power Transmission Limited – EQ