1. Home
  2. Tag "200 MW"

Petition for Adoption of tariff for purchase of power up to 200 MW of the DERC (Terms and Conditions for Determination of Tariff Regulations – EQ

Summary: — #### **1. Purpose** EPIL is inviting **Expressions of Interest (EOI)** from experienced and reputable Indian contractors/firms for **empanelment as potential partners** for upcoming **Solar PV Power Plant projects** on an **Engineering, Procurement, and Construction (EPC)** basis. The empanelment is for the following partnership models: – **Joint Venture (JV) Partner** – **Consortium Partner** – […]

Petition of the CERC (Procedure, Terms and Conditions for grant of trading licence and other related matters) Regulations, for the grant of a Category V Inter-State Trading Licence – EQ

ACME Solar and SECI Finalize PPA for 200 MW Solar Project with Battery Storage Integration – EQ

In Short : ACME Solar has signed a Power Purchase Agreement (PPA) with the Solar Energy Corporation of India (SECI) for a 200 MW solar project integrated with advanced battery energy storage. The partnership marks a significant step toward enhancing renewable energy reliability by delivering firm, dispatchable green power. The project aims to support grid […]

Yogi Adityanath Showcases Uttar Pradesh’s Green Ambitions During Visit to Japan’s Hydrogen Innovation Hub – EQ

Results : Balance of System tender for setting up of grid connected 200 MW Ground mounted Solar PV plant at Dhar, Madhya Pradesh – EQ

Summary: — ### **Document Title:** **Results — Balance of Systems Tender for Setting up of Grid Connected 200 MW Ground Mounted Solar PV Plant at Dhar, Madhya Pradesh** — ### **Issuing Authority:** **Solar Energy Corporation of India Ltd. (SECI)** **Tender No:** SECI/C&P/OP/11/017/2024-25 — ### **Purpose of the Tender:** The tender was issued for the **Balance […]

Cabinet approves Startup India Fund of Funds 2.0 to Mobilize Venture Capital for India’s Startup Ecosystem – EQ

Torrent Power Launches 200 MW FDRE Tender with Battery Storage to Strengthen Grid Reliability – EQ

In Short : Torrent Power has invited bids for 200 MW of Firm and Dispatchable Renewable Energy (FDRE) with battery storage, plus a 100 MW greenshoe option. Open to solar, wind, or hybrid projects, the tender requires ISTS connectivity, strict performance criteria, and BIS-approved technologies. The 25-year PPA aims to boost reliable, renewable-based power supply […]

Yogi Adityanath Showcases Uttar Pradesh’s Green Ambitions During Visit to Japan’s Hydrogen Innovation Hub – EQ

Extension II of Bid submission Deadline: BoS tender for setting up of grid connected 200 MW Ground mounted Solar PV plant at Dhar, MP – EQ

Extension II of Bid submission Deadline: Balance of System tender for setting up of grid connected 200 MW Ground mounted Solar PV plant at Dhar, Madhya Pradesh Extension of Bid submission Deadline: Existing Date & Time of Bid Submission: 05.06.2025 till 1400 HRS Existing Date & Time of Bid Opening: 05.06.2025 at 1600 HRS Revised […]

Cabinet approves Startup India Fund of Funds 2.0 to Mobilize Venture Capital for India’s Startup Ecosystem – EQ

Extension of Bid Submission Deadline : Balance of System tender for setting up of grid connected 200 MW Ground mounted Solar PV plant at Dhar, Madhya Pradesh – EQ

Extension of Bid Submission Deadline : Balance of System tender for setting up of grid connected 200 MW Ground mounted Solar PV plant at Dhar, Madhya Pradesh Owner: Solar Energy Corporation of India Limited (SECI), New Delhi, India Contract title: Balance of System tender for setting up of grid connected 200 MW Ground mounted Solar […]

Cabinet approves Startup India Fund of Funds 2.0 to Mobilize Venture Capital for India’s Startup Ecosystem – EQ