1. Home
  2. Tag "2005"

In the matter of petition filed under Section 86(1)(e), Section 86(1)(f) and Section 86(1)(a) read with Regulation 10 of “MPERC (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2010 and Para 18.15, 18.16. 18.18 and 18.20 of MPERC (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) Regulations, 2005.

In the matter of petition filed under Section 86(1)(e), Section 86(1)(f) and Section 86(1)(a) read with Regulation 10 of “MPERC (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2010 and Para 18.15, 18.16. 18.18 and 18.20 of MPERC (Terms and Conditions for Intra-State Open Access in Madhya Pradesh) Regulations, 2005. For more […]

Petition for the determination-cum-truing up of the transmission tariff for Bikaner with “Transmission System for the Evacuation of Power from REZ in Rajasthan (20 GW) under Phase III – Part J” – EQ

Extension of date for submission of comments on draft amendments in the Provisions relating to Captive Generating Plant in Electricity Rules, 2005

Extension of date for submission of comments on draft amendments in the Provisions relating to Captive Generating Plant in Electricity Rules, 2005 For more information please see below link: Source: powermin.nic.in

Petition for the determination-cum-truing up of the transmission tariff for Bikaner with “Transmission System for the Evacuation of Power from REZ in Rajasthan (20 GW) under Phase III – Part J” – EQ