1. Home
  2. Tag "2022"

Petition of the CERC (Connectivity and General Network Access to the Inter-State Transmission System) Regulations, 2022 – EQ

Summary: — ## ⚖️ **Petition Summary** * **Petition No.**: 657/MP/2025 * **Filed By**: JSW Renew Energy Five Limited (JREFL) * **Respondents**: Central Transmission Utility of India Ltd. (CTUIL) and others * **Date of Hearing**: 17 July 2025 * **Forum**: CERC, New Delhi — ## 📌 **Legal Basis** * **Filed under**: * Section **79(1)(c)** and **79(1)(f)** […]

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Petition of the GERC (Procurement of Energy from Renewable Sources) (First Amendment) (Second Amendment) (Third Amendment) Regulations, 2022 – EQ

Petition of the GERC (Procurement of Energy from Renewable Sources) (First Amendment) (Second Amendment) (Third Amendment) Regulations, 2022 For more information please see below link:

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ

Petition of the CERC (Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation) Regulations 2022 – EQ

Petition of the CERC (Terms and Conditions for Renewable Energy Certificates for Renewable Energy Generation) Regulations 2022 For more information please see below link:

Petition for Adoption of tariff of 1200 MW Wind-Solar Hybrid Power Projects connected to the ISTS as amended from time to time – EQ