1. Home
  2. Tag "330 MW"

Petition for Determination of Tariff for Control Period 2024 to 2029 for the 330 MW (4 x 82.5 MW) Shrinagar Hydro Electric Project under the PPA – EQ

Petition for Determination of Tariff for Control Period 2024 to 2029 for the 330 MW (4 x 82.5 MW) Shrinagar Hydro Electric Project under the PPA For more information please see below link:

Petition for Adoption of Transmission Charges with respect to the Transmission System being established by the Davanagere Power Transmission Limited – EQ

Ayana Renewable inks pact to set up 330-MW RE capacity for Hindalco – EQ

Mumbai (Maharashtra)/ Bangalore (Karnataka) [India] : Ayana Renewable Power, one of the largest Independent Power Producers (IPP) in India and backed by National Infrastructure and Investment Fund (NIIF), British International Investment (BII) and Green Growth Equity Fund, has signed a Power Purchase Agreement with Hindalco Industries Limited, the metals flagship company of the Aditya Birla […]

Adani Clean Energy Businesses Achieve Milestone Year as Solar, Wind and Green Hydrogen Scale Up – EQ

Petition for Approval of Provisional tariff petition for the Tariff year 2023-24 pertaining to the 330 MW 4 x 82.5 Srinagar Hydro electric Project – EQ Mag

Petition for Approval of Provisional tariff petition for the Tariff year 2023-24 pertaining to the 330 MW 4 x 82.5 Srinagar Hydro electric Project For more information please see below link:

Petition for Adoption of Transmission Charges with respect to the Transmission System being established by the Davanagere Power Transmission Limited – EQ

Determination of Tariff for the Control Period 2019-24 for the 330 MW Shrinagar Hydro Electric Project under the PPA – EQ Mag

Determination of Tariff for the Control Period 2019-24 for the 330 MW Shrinagar Hydro Electric Project under the PPA. For more information please see below link:

Petition for Adoption of Transmission Charges with respect to the Transmission System being established by the Davanagere Power Transmission Limited – EQ

Determination of Tariff for the Control Period 2019-24 for the 330 MW Shrinagar Hydro Electric Project under the PPA – EQ Mag Pro

Determination of Tariff for the Control Period 2019-24 for the 330 MW Shrinagar Hydro Electric Project under the PPA. For more information please see below link:

Petition for Adoption of Transmission Charges with respect to the Transmission System being established by the Davanagere Power Transmission Limited – EQ

Approval of Provisional Tariff for FY 2022-23 pertaining to the 330 MW ( 4 x 82.5) Shrinagar Hydro Electric Project – EQ Mag Pro

Approval of Provisional Tariff for FY 2022-23 pertaining to the 330 MW ( 4 x 82.5) Shrinagar Hydro Electric Project. For more information please see below link:

Petition for Adoption of Transmission Charges with respect to the Transmission System being established by the Davanagere Power Transmission Limited – EQ

Petition for Approval of Provisional Tariff for FY 2022-23 pertaining to the 330 MW ( 4 x 82.5) Shrinagar Hydro Electric Project – EQ Mag Pro

Petition for Approval of Provisional Tariff for FY 2022-23 pertaining to the 330 MW ( 4 x 82.5) Shrinagar Hydro Electric Project. For more information please see below link:

Petition for Adoption of Transmission Charges with respect to the Transmission System being established by the Davanagere Power Transmission Limited – EQ

Tata Power to Set Up 330-MW Solar Project in Madhya Pradesh – EQ Mag Pro

The power will be supplied to the Indian Railways and the Madhya Pradesh Power Management Company. New Delhi: Tata Power’s wholly-owned subsidiary, TP Saurya, has received a Letter of Award from Rewa Ultra Mega Solar to set up a 330-megawatt (MW) solar power project in Neemuch Solar Park, Madhya Pradesh. The project has been awarded […]

India’s Non-Fossil Power Generation Share Rises Toward One-Third Milestone – EQ