Petition for treatment of power drawn by CTU connected 750 MW Rewa Solar Project during non-generation night hours and during shutdown periods and determination of tariff thereof – EQ Mag Pro November 18, 2021 Anand Gupta 000 Petition for treatment of power drawn by CTU connected 750 MW Rewa Solar Project during non-generation night hours and during shutdown periods and determination of tariff thereof. For more information please see below link: Read more Petition for the determination of transmission tariff for asset under ‘Transmission Network Expansion in Gujarat to increase ATC from ISTS, Part-B” in the Western Region – EQ