Petition for Adoption of Transmission Charges with respect to the Transmission System the Bikaner A Power Transmission Limited – EQ February 12, 2025 Anand Gupta 000 Policy & Regulation Petition for Adoption of Transmission Charges with respect to the Transmission System the Bikaner A Power Transmission Limited For more information please see below link: Read more Petition of the CERC (Connectivity and General Network Access to inter- State Transmission System) Regulations of 500 MW installed capacity Hybrid Renewable Energy Project – EQ