1. Home
  2. Tag "ADOPTION"

Petition for Adoption of 6000 MWh Peak Power from ISTS- connected Renewable Energy Power Projects with Energy Storage System anywhere in India – EQ

Summary: —- **Key Regulatory Developments:** 1. **Compliance with Previous Orders:** SJVNL informed the Commission that it has complied with directions from the January 21, 2026 hearing. It filed an affidavit on February 4, 2026, providing details regarding the competitiveness of the discovered tariff. 2. **Power Sale Agreement (PSA) Progress:** – SJVNL has entered into a […]

In the matter of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for “Transmission System associated with Vindhyachal-V (500 MW) Project of NTPC (Part A)” in the Western Region – EQ

MeitY Launches 30 kW Wide Band Gap (WBG)–Based Integrated Drive System to Boost Electric Vehicle Adoption – EQ

In Short : The Ministry of Electronics and Information Technology launched a 30 kW Wide Band Gap–based Integrated Drive System aimed at improving electric vehicle efficiency and performance. Developed under indigenous technology initiatives, the system integrates advanced power electronics to support higher efficiency, compact design, and better thermal performance, contributing to India’s efforts to promote […]

India-EU Trade and Technology Council 2nd Workshop on EV Charging Technologies: Advanced Cooperation on Standardisation, Smart and Bidirectional Charging, Megawatt Charging Systems, and Wireless Charging – EQ

Petition for Adoption for Despatchable Power under “Greenshoe Option” from ISTS connected RE Power Projects with ESS by Ministry of Power – EQ

Summary: —- **1. Case Overview** This document is a Record of Proceedings (RoP) from the Central Electricity Regulatory Commission (CERC) regarding a petition filed by NHPC Limited. NHPC is seeking the Commission’s adoption of tariff for an additional 1150 MW of Firm & Despatchable renewable power. This capacity was procured under the “Greenshoe Option” from […]

In the matter of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for “Transmission System associated with Vindhyachal-V (500 MW) Project of NTPC (Part A)” in the Western Region – EQ

Petition for the Adoption of tariff for 2100 MW Firm & Despatchable Power from ISTS connected RE Power Projects by Govt. of India – EQ

Summary: — ### Key Business, Legal & Regulatory Points **1. Parties & Subject Matter** – **Petitioner:** NHPC Limited (designated as an Intermediary Procurer/REIA by MNRE). – **Respondents:** Five successful Renewable Energy Power Generators (REPGs), including Avaada Energy, Essar Renewables, and Serentica Renewables. – **Subject:** Petition under Section 63 of the Electricity Act, 2003, seeking adoption […]

In the matter of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for “Transmission System associated with Vindhyachal-V (500 MW) Project of NTPC (Part A)” in the Western Region – EQ

Solar Energy Adoption Enables Trichy Corporation to Save ₹7.3 Crore Over Five Years – EQ

In Short : The municipal corporation of Tiruchirappalli has saved ₹7.3 crore over five years through extensive adoption of solar power across civic infrastructure. By installing rooftop solar systems and renewable energy solutions in public facilities, the corporation reduced electricity costs, improved sustainability, and strengthened its long-term financial and environmental performance. In Detail : The […]

Energy Storage and Grid Flexibility Emerge as Immediate Priorities for India’s Power System – EQ

In the matter for the adoption of Transmission Charges with Transmission System being established by POWERGRID Mandsaur Augmentation Transmission Limited – EQ

Summary: — ### Key Business and Regulatory Points #### 1. Core Objective and Legal Framework – **Purpose of the Petition:** The Petitioner sought the adoption of transmission charges for a new ISTS project by the Central Electricity Regulatory Commission (CERC) under **Section 63 of the Electricity Act, 2003**. – **Legal Basis (Section 63):** This section […]

In the matter of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for “Transmission System associated with Vindhyachal-V (500 MW) Project of NTPC (Part A)” in the Western Region – EQ

EV CHARGING STATIONS – EQ

In Short : EV charging stations are critical to accelerating electric vehicle adoption in India. Expanding public and private charging networks enhances convenience, reduces range anxiety, and supports clean mobility goals. With government incentives and private investments rising, EV infrastructure is becoming a key pillar in India’s transition toward sustainable and low-carbon transportation. In Detail […]

India-EU Trade and Technology Council 2nd Workshop on EV Charging Technologies: Advanced Cooperation on Standardisation, Smart and Bidirectional Charging, Megawatt Charging Systems, and Wireless Charging – EQ

ACCELERATION IN ADOPTION OF ELECTRIC VEHICLE THROUGH PM E-DRIVE SCHEME – EQ

In Short : The PM E-DRIVE Scheme is India’s flagship electric mobility initiative aimed at dramatically boosting EV adoption across vehicle segments by offering targeted demand incentives, expanding charging infrastructure, and supporting large-scale deployment of electric buses, trucks, two- and three-wheelers. With over 1.13 million EVs delivered in its first year and major infrastructure rollouts […]

India-EU Trade and Technology Council 2nd Workshop on EV Charging Technologies: Advanced Cooperation on Standardisation, Smart and Bidirectional Charging, Megawatt Charging Systems, and Wireless Charging – EQ

Model Solar Village Contest Drives Rapid Growth in Rooftop Solar Adoption Across Rural India – EQ

In Short : The Model Solar Village contest has triggered a sharp rise in rooftop solar installations by encouraging villages to compete in adopting clean energy solutions. The initiative promotes decentralised power generation, reduces electricity costs, and raises awareness about renewable energy, helping rural communities become more self-reliant while supporting India’s broader clean energy and […]

Energy Storage and Grid Flexibility Emerge as Immediate Priorities for India’s Power System – EQ

Petition for Approval of procurement of power by Distribution Licensees to ensure availability of sufficient power during summer peak and Adoption of tariff and approval of draft PPA – EQ

Summary: — **1. Case Overview** – **Petition No.:** 01/2026 – **Date of Hearing:** 10 February 2026 – **Date of Order:** 10 February 2026 – **Petitioner:** Tata Power Delhi Distribution Ltd. (TPDDL) – **Regulatory Authority:** Delhi Electricity Regulatory Commission (DERC) – **Coram:** – Sh. Surender Babbar, Member – Sh. Ram Naresh Singh, Member **2. Legal Framework […]

In the matter of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for “Transmission System associated with Vindhyachal-V (500 MW) Project of NTPC (Part A)” in the Western Region – EQ