1. Home
  2. Tag "ADOPTION"

Petition for Adoption of Tariff for Supply of 6000 MWh Assured Peak Power from ISTS-connected RE Power Projects with ESS anywhere in India – EQ

Summary: —- **Project Overview:** – **Project:** Supply of 6,000 MWh of assured peak power (equivalent to 1500 MW for 4 hours). – **Type:** ISTS-connected Renewable Energy (RE) power projects with Energy Storage Systems (ESS). – **Location:** Anywhere in India. – **Tariff Discovery:** Tariff was determined through a transparent Competitive Bidding Process, and the petitioner seeks […]

Petition of Adoption of tariff for approval of prefixed levelized tariff for PoP from Decentralize Ground / Stilt Mounted Grid Connected Solar ad PM-KUSUM scheme as per Government of Gujarat – EQ

Petition for Adoption of 6000 MWh Peak Power from ISTS- connected Renewable Energy Power Projects with Energy Storage System anywhere in India – EQ

Summary: —- **Key Regulatory Developments:** 1. **Compliance with Previous Orders:** SJVNL informed the Commission that it has complied with directions from the January 21, 2026 hearing. It filed an affidavit on February 4, 2026, providing details regarding the competitiveness of the discovered tariff. 2. **Power Sale Agreement (PSA) Progress:** – SJVNL has entered into a […]

Petition of Adoption of tariff for approval of prefixed levelized tariff for PoP from Decentralize Ground / Stilt Mounted Grid Connected Solar ad PM-KUSUM scheme as per Government of Gujarat – EQ

MeitY Launches 30 kW Wide Band Gap (WBG)–Based Integrated Drive System to Boost Electric Vehicle Adoption – EQ

In Short : The Ministry of Electronics and Information Technology launched a 30 kW Wide Band Gap–based Integrated Drive System aimed at improving electric vehicle efficiency and performance. Developed under indigenous technology initiatives, the system integrates advanced power electronics to support higher efficiency, compact design, and better thermal performance, contributing to India’s efforts to promote […]

POWER GENERATION AND DEMAND-SUPPLY GAP – EQ

Petition for Adoption for Despatchable Power under “Greenshoe Option” from ISTS connected RE Power Projects with ESS by Ministry of Power – EQ

Summary: —- **1. Case Overview** This document is a Record of Proceedings (RoP) from the Central Electricity Regulatory Commission (CERC) regarding a petition filed by NHPC Limited. NHPC is seeking the Commission’s adoption of tariff for an additional 1150 MW of Firm & Despatchable renewable power. This capacity was procured under the “Greenshoe Option” from […]

Petition of Adoption of tariff for approval of prefixed levelized tariff for PoP from Decentralize Ground / Stilt Mounted Grid Connected Solar ad PM-KUSUM scheme as per Government of Gujarat – EQ

Petition for the Adoption of tariff for 2100 MW Firm & Despatchable Power from ISTS connected RE Power Projects by Govt. of India – EQ

Summary: — ### Key Business, Legal & Regulatory Points **1. Parties & Subject Matter** – **Petitioner:** NHPC Limited (designated as an Intermediary Procurer/REIA by MNRE). – **Respondents:** Five successful Renewable Energy Power Generators (REPGs), including Avaada Energy, Essar Renewables, and Serentica Renewables. – **Subject:** Petition under Section 63 of the Electricity Act, 2003, seeking adoption […]

Petition of Adoption of tariff for approval of prefixed levelized tariff for PoP from Decentralize Ground / Stilt Mounted Grid Connected Solar ad PM-KUSUM scheme as per Government of Gujarat – EQ

Solar Energy Adoption Enables Trichy Corporation to Save ₹7.3 Crore Over Five Years – EQ

In Short : The municipal corporation of Tiruchirappalli has saved ₹7.3 crore over five years through extensive adoption of solar power across civic infrastructure. By installing rooftop solar systems and renewable energy solutions in public facilities, the corporation reduced electricity costs, improved sustainability, and strengthened its long-term financial and environmental performance. In Detail : The […]

India’s 102 GWh Storage Tender Surge Accelerates Path to 346 GWh Energy Capacity by 2033 – EQ

In the matter for the adoption of Transmission Charges with Transmission System being established by POWERGRID Mandsaur Augmentation Transmission Limited – EQ

Summary: — ### Key Business and Regulatory Points #### 1. Core Objective and Legal Framework – **Purpose of the Petition:** The Petitioner sought the adoption of transmission charges for a new ISTS project by the Central Electricity Regulatory Commission (CERC) under **Section 63 of the Electricity Act, 2003**. – **Legal Basis (Section 63):** This section […]

Petition of Adoption of tariff for approval of prefixed levelized tariff for PoP from Decentralize Ground / Stilt Mounted Grid Connected Solar ad PM-KUSUM scheme as per Government of Gujarat – EQ

EV CHARGING STATIONS – EQ

In Short : EV charging stations are critical to accelerating electric vehicle adoption in India. Expanding public and private charging networks enhances convenience, reduces range anxiety, and supports clean mobility goals. With government incentives and private investments rising, EV infrastructure is becoming a key pillar in India’s transition toward sustainable and low-carbon transportation. In Detail […]

POWER GENERATION AND DEMAND-SUPPLY GAP – EQ

ACCELERATION IN ADOPTION OF ELECTRIC VEHICLE THROUGH PM E-DRIVE SCHEME – EQ

In Short : The PM E-DRIVE Scheme is India’s flagship electric mobility initiative aimed at dramatically boosting EV adoption across vehicle segments by offering targeted demand incentives, expanding charging infrastructure, and supporting large-scale deployment of electric buses, trucks, two- and three-wheelers. With over 1.13 million EVs delivered in its first year and major infrastructure rollouts […]

POWER GENERATION AND DEMAND-SUPPLY GAP – EQ

Model Solar Village Contest Drives Rapid Growth in Rooftop Solar Adoption Across Rural India – EQ

In Short : The Model Solar Village contest has triggered a sharp rise in rooftop solar installations by encouraging villages to compete in adopting clean energy solutions. The initiative promotes decentralised power generation, reduces electricity costs, and raises awareness about renewable energy, helping rural communities become more self-reliant while supporting India’s broader clean energy and […]

India’s 102 GWh Storage Tender Surge Accelerates Path to 346 GWh Energy Capacity by 2033 – EQ