1. Home
  2. Tag "Adoption of Tariff"

Petition for Adoption of tariff for 1.5 GW Solar PV Power Projects connected to the interstate Transmission System and as amended from time to time – EQ

Summary: — ## **Case Overview** * **Petition No.:** 238/AT/2025 * **Filed By:** NTPC Limited * **Respondents:** Apraava Energy Pvt. Ltd. and others * **Subject:** Petition under **Section 63 of the Electricity Act, 2003** for adoption of tariff for **1500 MW Solar PV Power Projects**. * These projects are connected to the **Interstate Transmission System (ISTS)**. […]

In the matter of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and the determination of the transmission tariff for Strengthening Scheme-XXII” in the Northern Region – EQ

Petition of Adoption of Tariff for long term procurement of 780 MW Wind – Solar Hybrid Power from NTPC – EQ

Summary: — ## **Case Details** * **Commission:** Maharashtra Electricity Regulatory Commission (MERC) * **Petitioner:** *Maharashtra State Electricity Distribution Company Ltd. (MSEDCL)* * **Respondent:** *NTPC Ltd.* * **Case No.:** 123 of 2024 * **Order Date:** 10 September 2025 — ## **Petition Summary** * **Objective:** Approval for long-term procurement of **780 MW Wind–Solar Hybrid Power** from NTPC […]

In the matter of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and the determination of the transmission tariff for Strengthening Scheme-XXII” in the Northern Region – EQ

Petition for procurement and adoption of tariff from Grid connected 250 MW Wind (Phase IX) – EQ

Summary: — # ⚖️ Case Details * **Forum:** GERC, Gandhinagar. * **Petition No.:** 2528 of 2025. * **Filed under:** Section 63 + Section 86(1)(b), Electricity Act, 2003. * **Petitioner:** Gujarat Urja Vikas Nigam Ltd. (GUVNL). * Representative: Mr. Rushabh Soni. * **Respondents:** 1. KPI Green Energy Ltd. – Mr. Karmit Sheth. 2. Juniper Green Energy […]

In the matter of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and the determination of the transmission tariff for Strengthening Scheme-XXII” in the Northern Region – EQ

Petition for Adoption of tariff for 420 MW RTC power from ISTS-connected Renewable Energy Power Projects (SECI-RTC-IV) by the Ministry of Power, Government of India – EQ

Summary: # CERC — RoP in Petition No. 722/AT/2025 * **Matter:** Adoption of tariff under **Section 63** for **420 MW RTC** power from **ISTS-connected RE projects (SECI-RTC-IV)**, discovered via competitive bidding per **MoP guidelines dated 9-Jun-2023 (with amendments)**.  * **Petitioner:** **Solar Energy Corporation of India Ltd. (SECI)**; **Respondents:** Hero Solar Energy Pvt. Ltd. & Ors.  […]

In the matter of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and the determination of the transmission tariff for Strengthening Scheme-XXII” in the Northern Region – EQ

Petition for Adoption of Tariff for setting up of 1200 MW ISTS-Connected Wind-Solar Hybrid Power Projects (HYBRID-3) – EQ

Summary: — ## **Case Summary – SJVN Tariff Adoption (Hybrid-3 Project)** **Forum:** Central Electricity Regulatory Commission (CERC), New Delhi **Petition No.:** 684/AT/2025 **Date of Hearing:** 12 August 2025 **Coram:** * Jishnu Barua, Chairperson * Ramesh Babu V., Member * Harish Dudani, Member * Ravinder Singh Dhillon, Member — ### **1. Case Background** * **Petitioner:** SJVN […]

In the matter of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and the determination of the transmission tariff for Strengthening Scheme-XXII” in the Northern Region – EQ

Petition for Adoption of tariff for 100 MW Solar PV Power Project (Tranche- VIII) connected to ISTS of the Government of India – EQ

Summary: — ## **Case Summary – SECI vs. AMP Energy Utility Pvt. Ltd. & Ors.** **Forum:** Central Electricity Regulatory Commission (CERC), New Delhi **Petition No.:** 723/AT/2025 **Date of Hearing:** 12 August 2025 **Coram:** * Jishnu Barua, Chairperson * Ramesh Babu V., Member * Harish Dudani, Member * Ravinder Singh Dhillon, Member — ### **1. Case […]

In the matter of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and the determination of the transmission tariff for Strengthening Scheme-XXII” in the Northern Region – EQ

Petition for Adoption of tariff for the ISTS Grid Connected Solar Power Projects of 1200 MW with Greenshoe – EQ

Summary: — ## 📌 Case Overview * **Petitioner:** NHPC Limited * **Respondents:** Teerth Gopicon Ltd. & Ors. * **Subject:** Petition under Section 63 of the Electricity Act, 2003 for **adoption of tariff** for **1200 MW ISTS-connected solar projects**, with additional capacity of **up to 1200 MW under Greenshoe Option**. * **Date of Hearing:** 5th August […]

In the matter of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and the determination of the transmission tariff for Strengthening Scheme-XXII” in the Northern Region – EQ

Petition for Adoption of tariff discovered under Competitive Bidding Process from 250 MW Grid connected Solar PV Power Projects anywhere in India – EQ

Summary: — ## **Gujarat Electricity Regulatory Commission (GERC) – Daily Order** ### 📌 Case Details * **Petition No.:** 2484 of 2025 * **Petitioner:** Gujarat Urja Vikas Nigam Limited (GUVNL) * **Respondents:** 1. Welspun Renewable Energy Ltd. – 50 MW @ ₹2.60/unit 2. Avaada Energy Pvt. Ltd. – 100 MW @ ₹2.60/unit 3. SAEL Industries Ltd. […]

In the matter of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and the determination of the transmission tariff for Strengthening Scheme-XXII” in the Northern Region – EQ

Petition for Adoption of tariff of Procurement of Storage Capacity from 250 MW/500 MWh Standalone Battery Energy Storage Systems – EQ

Summary: — ## **Case Summary** **Forum:** Gujarat Electricity Regulatory Commission (GERC), Gandhinagar **Petition No.:** 2371 of 2024 **Date of Order:** 17 July 2025 — ### **Parties** * **Petitioner:** Gujarat Urja Vikas Nigam Limited (GUVNL) *Represented by:* Mr. Nagajan H. Parmar & Mr. Sumit D. Harwani * **Respondent:** M/s Gensol Engineering Limited *Representation:* None present — […]

In the matter of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and the determination of the transmission tariff for Strengthening Scheme-XXII” in the Northern Region – EQ

Petition for Adoption of Tariff of 1.2 GW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India basis with ‘Green- Shoe Option” – EQ

Petition for Adoption of Tariff of 1.2 GW ISTS Grid connected Wind – Solar Hybrid Power projects on anywhere in India basis with ‘Green- Shoe Option” For more information please see below link:

In the matter of the CERC (Conduct of Business) and (Terms and Conditions of Tariff) Regulations for truing up and the determination of the transmission tariff for Strengthening Scheme-XXII” in the Northern Region – EQ